Availability
58-60 Impala , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-30 ohms, Lever, 3/8 in. Fuel Line, Chevy, GM#6428052 , Each
Part Number: SUM-RP21699
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, 1969 Mustang, Cougar, 3/8" fuel Line, Without Low Fuel Warning, Repl Ford#C9ZZ-9275-C, Each
Part Number: SUM-RP23650
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Temperature Sender 300 Degree M14 X 1.5 Thread Screw Cap
Part Number: VDO-323-055
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, 18 Gallon, 0-30 Ohm, Chevrolet, GMC, Each
Part Number: TNK-DI-T60
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Temperature Sender 250 Degree 1/8"-27 NPT Thread
Part Number: VDO-323095
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sending Unit, Water Temperature, 240 Degree, 1/2 NPT, Each
Part Number: SWW-362AH-D
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sending Unit, 11 Volt Sensor, Each
Part Number: AWW-510287
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, 240 - 33.5 ohms, 15.5 in. To 24 in. Height, Right Hand Flange Position, Each
Part Number: SWW-391D-D
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
53-54 Chevy Passenger , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-30 ohms, Lever, 5/16 in. Fuel Line, Chevy, GM#1517761 , Each
Part Number: SUM-RP21688
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Switch, Temperature, 225 Degrees F, 1/4 in. NPTF, Spade Terminal, Each
Part Number: SWW-83301
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, 3/8 in. Line, Chevy, Each
Part Number: OER-6426973
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
1968-70 GM A Body , Sending Unit, Fuel Tank, 3/8 in. Line, 0 ohms Empty, 90 ohms Full, Buick, Chevrolet, Olds, Pontiac, GM#06428035 , Each
Part Number: SUM-RP22011
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pressure Sender 0-80 Psi 1/8 in. NPT
Part Number: VDO-360801
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
1971-72 GM A Body , Sending Unit, Fuel Tank, 3/8 in. Line, 0 ohms Empty, 30 ohms Full, Buick, Chevrolet, Olds, Pontiac, GM#06428838 , Each
Part Number: SUM-RP22013
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sending Unit, Pressure, 30 psi, 1/8 in.-27 NPT, Each
Part Number: ATM-3242
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sensor, Water Temperature, 1/8 in. NPT, Universal, Each
Part Number: CIN-SN22
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, 20 Gallon, Chevrolet, GMC, Each
Part Number: TNK-FG71B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sending Unit, Fuel Level, 3/8 in. Fuel Line, Chevy, GMC, Each
Part Number: OER-6428271
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, Replacement, Steel, Plastic Float, Strainer, Gasket, 3/8 in. Outlet, 1/4 in. Return, Chevrolet, Nova, Each
Part Number: OER-K4042
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
56-60 Corvette , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-30 ohms, Lever, 3/8 in. Fuel Line, Chevy, GM#1518785 , Each
Part Number: SUM-RP21695
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sending Unit, Temperature, 0-250 Degree, Each
Part Number: VDO-323421
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sending Unit, Fuel Level, 0-90 Ohms, GM, Each
Part Number: VDO-226008
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Sender, Oil Pressure, Buick, Cadillac, Chevy, GMC, Each
Part Number: RNB-926-397
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Fuel Tank Sending Unit, 240 - 33 ohms, 10 in. To 15 in. Height, Each
Part Number: SWW-391B-F
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pressure Sender/Switch, OEM Replacement, Chevy, GMC, Hummer, Oldsmobile, Pontiac, Each
Part Number: SMP-PS308
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.