Availability
Showing In Stock Items. Show All 34 Items.
Retainer, Speedometer Fitting, GM TH400, 700R4, Steel, Each
Part Number: SUM-700019
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
BUILD IT WITH SUMMIT!
Sending Unit, Water Temperature, Replacement for SUM-G2984-1, SUM-800500, and SUM-800600, Each
Part Number: SUM-G2984-1S
Estimated Ship Date: Today
Estimated Ship Date: Today
Speedometer Cable, GM, TH350/TH400/700R4, Polyethylene Jacket, Black, Each
Part Number: LOK-SP-1500U
Estimated Ship Date: Today
Estimated Ship Date: Today
Speedometer Cable, Ford, C4/C6/AOD/FMX, Polyethylene Jacket, Black, Each
Part Number: LOK-SP1502U
Estimated Ship Date: Today
Estimated Ship Date: Today
Gauge Package, USA Performance Series, Direct-Fit, Analog, White Face, Stainless Steel Bezel, Chevy, Each
Part Number: NVU-01670-03
Estimated Ship Date: Today
Estimated Ship Date: Today
Master Flo-Check, Checks Flowing Fuel Pressures, w/ Gauge
Part Number: NEX-15519
Estimated Ship Date: Today
Estimated Ship Date: Today
Gauges, Performance Series, Oil Pressure, Water Temperature, Speedometer, Tach, Black Face, Analog, Chevy, Kit
Part Number: NVU-01670-01
Estimated Ship Date: Today
Estimated Ship Date: Today
Gauge, Brake Pressure, 0-3,000 psi, 1 1/2 in., Analog, Mechanical, Each
Part Number: TSB-A1704
Estimated Ship Date: Today
Estimated Ship Date: Today
Speedometer Cable, GM, TH200/200-4R/4L60/Powerglide, Stainless Steel Jacket, Natural, Each
Part Number: LOK-SP-1501HT
Estimated Ship Date: Today
Estimated Ship Date: Today
Gauges, Vintage USA 1969 Series, Black Face, Stainless Steel Bezel, Chevy, Kit
Part Number: NVU-69670-01
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO CFR BLUE
Part Number: NVU-20670-05
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Gauge Line, Braided Stainless, -4 AN, 24 in. Length, -4 AN, 1/8 in. NPT Hose Ends, Each
Part Number: LNG-45020
Estimated Ship Date: Today
Estimated Ship Date: Today
Gauge Line, Braided Stainless, -4 AN, 36 in. Length, -4 AN, 1/8 in. NPT Hose Ends, Each
Part Number: LNG-45030
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
Gauge Line, Braided Stainless, -4 AN, 60 in. Length, -4 AN, 1/8 in. NPT Hose Ends, Each
Part Number: LNG-45050
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
GEN II CAMARO PERFORMNCE II
Part Number: NVU-02670-01
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
GEN II CAMARO AVAITOR
Part Number: NVU-44670-01
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO PERFORMNCE II
Part Number: NVU-02670-03
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Gauge Line, Braided Stainless, -4 AN, 48 in. Length, -4 AN, 1/8 in. NPT Hose Ends, Each
Part Number: LNG-45040
Not Yet Reviewed
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
GEN II CAMARO CFR RED
Part Number: NVU-20670-01
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO CFR RED 240 KPH
Part Number: NVU-20670-01M
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO CFR BLUE 240 KPH
Part Number: NVU-20670-05M
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO 69 SERIES 4
Part Number: NVU-69670-01M
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO AVAITOR 240 KPH
Part Number: NVU-44670-01M
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO PERFORMNCE II
Part Number: NVU-02670-01M
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
GEN II CAMARO PERFORMNCE II
Part Number: NVU-02670-03M
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Speedometer Cable, GM/Ford/Chrysler, Thread-On, 5/8 in. and 7/8 in. Female Threads, Each
Part Number: SDU-A-282
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.