Availability
1978-87 El Camino , Sending Unit, Fuel Tank, 3/8 in. Line, 0 ohms Empty, 90 ohms Full, Chevrolet, 17.5 Gallon Tank , GM#19180450 , Each
Part Number: SUM-RP22014
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
1972 Chevy / GMC Truck , Fuel Tank Sending Unit , Auto Trans , Includes Gaskets , and Filter Sock , GM#6429117 , GM , Each
Part Number: SUM-RP20025
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge Cluster Assembly, OEM Replacement, Chevy, GMC, C/K Truck, Suburban, 1969-1972, Analog, Electrical, Black Face, Kit
Part Number: SUM-RP22099
Not Yet Reviewed
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge, Screw-In, Water Temperature, 0-250 Degrees F, 2 in., Analog, Mechanical, White Face, Each
Part Number: SUM-350120
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge, Fuel Pressure, 0-30 psi, 1 1/2 in., Analog, Mechanical, White Face, Each
Part Number: SUM-800136
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
1967-71 Chevy / GMC Truck , Fuel Tank Sending Unit , 6 Cylinder , 5/16" Line , Includes Gaskets and Filter Sock , GM#6428362 , GM , Each
Part Number: SUM-RP20023
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Speedometer Gear Housing Bullet, 18-23 Tooth, Steel, Chevy, TH350, PG, Each
Part Number: SUM-700319
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge Panel, Digital, Oil Pressure, Voltmeter, Water Temperature, Sending Units, 2 1/16 in. Diameter Gauges, Kit
Part Number: SUM-G2979
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
1982 Corvette , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-90 ohms, Lever, 3/8 in. Fuel Line, Chevy, GM#25003153 , Each
Part Number: SUM-RP21710
Not Yet Reviewed
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Tachometer, 09 Series, 0-8,000 rpm, 3 1/2 in., Analog, Electrical, Each
Part Number: SUM-G29102
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
55-57 Chevy Passenger , Fuel Tank Sending Unit, Direct-Fit , Fuel Level, Electrical, 0-30 ohms, Lever, 3/8 in. Fuel Line, Chevy, GM#1518784 , Each
Part Number: SUM-RP21694
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
1960-66 Chevy / GMC Truck , Fuel Tank Sending Unit , Includes Gaskets & Filter Sock , GM# 6428058 , GM , Each
Part Number: SUM-RP20020
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Voltmeter Gauge, Direct-Fit , Replacement, 8-18 V, Chevrolet, GMC, GM#6474584 , Each
Part Number: SUM-RP21721
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge Cluster Assembly, OEM Replacement, Chevy, GMC, C/K Truck, Suburban, 1969-1972, Analog, Electrical, Black Face, Kit
Part Number: SUM-RP22101
Not Yet Reviewed
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Instrument Gauge Cluster Lens, 1973-87 Chevy/GMC Truck, With Gauges, Without Clock, Replaces OEM#06497473, Each
Part Number: SUM-RP22199
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Speedometer, 1976-79 Chevy/GMC Truck, 1st Design, Fire Orange Needle, Each
Part Number: SUM-RP22652
Not Yet Reviewed
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Fuel Tank Sending Unit, Lever Style, 0-90 ohms, 3/8 in. Line, Chevrolet, Each
Part Number: SUM-RP21737
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Instrument Clusters, Direct Fit, 12-Volt, Black Face, White Numbers,White Pointer, Oil Pressure, Water Temp, Voltage Gauge, Ammeter. Chevy, Each
Part Number: SUM-RP22083
Not Yet Reviewed
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Tachometer Gauge, Direct-Fit, Replacement, 1979-87 Chevrolet, GMC, Truck/Blazer, GM#25054251 , Each
Part Number: SUM-RP22054
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Clock, 1955-56 Chevy Passenger, 1958-1962 Corvette, Repl GM#03710648, Each
Part Number: SUM-RP22208
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge, Fuel Pressure, Test Gauge, 0-60 psi, 1 1/2 in., Analog, Mechanical, Each
Part Number: SUM-800137
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
1947-59 Chevy / GMC Truck , Fuel Tank Sending Unit , Repl. , W/ Fuel Pick-Up Tube , Incl. Gaskets and Filter Sock , GM#6428049 , Details
Part Number: SUM-RP20019
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Instrument Clusters, Direct Fit, 12-Volt, Black Face, White Numbers,White Pointer, Oil Pressure, Water Temp, Voltage Gauge, Ammeter. Chevy, Each
Part Number: SUM-RP22084
Not Yet Reviewed
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Gauge, Digital, Water Temperature, 2 1/16 in. Diameter, Black Face, Blue Numbers, Each
Part Number: SUM-G2984-1B
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Sending Unit, Oil Pressure, Two Wire, Replacement for SUM-G2977, Each
Part Number: SUM-G2977-S
Estimated Ship Date: Monday 6/2/2025
Estimated Ship Date: Monday 6/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.