Availability
Power Steering Pressure Hose, High-pressure, Rubber, Black, Oldsmobile, Each
Part Number: EDD-70203
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Tank To Pump Lines, Stainless Steel, Natural, 5/16 in. Fuel Line Diameter, Jeep, 232, Set
Part Number: CST-JEF1017-SS
Not Yet Reviewed
Estimated Ship Date: Dec 2, 2025 if ordered today
Estimated Ship Date: Dec 2, 2025 if ordered today
Fuel Line, Steel, Hard, Tank to Pump, 0.313 in. Chevy, Each
Part Number: CST-CEF1003-OE
Not Yet Reviewed
Estimated Ship Date: Dec 2, 2025 if ordered today
Estimated Ship Date: Dec 2, 2025 if ordered today
Pump To Carburetor Line, Steel, Ford, 289 c.i.d., Fits Shelby GT350 with 715 cfm Holley (Shelby) Carb, Each
Part Number: CST-MUC1008-OE
Not Yet Reviewed
Estimated Ship Date: Dec 2, 2025 if ordered today
Estimated Ship Date: Dec 2, 2025 if ordered today
Pump To Carburetor Line, Steel, Natural, Ford, 289, Fits Holley 600 cfm, Left Side Outlet, Each
Part Number: CST-MUC1026-OE
Estimated Ship Date: Dec 2, 2025 if ordered today
Estimated Ship Date: Dec 2, 2025 if ordered today
Brake Lines, Front/Rear, Steel, Natural, With Valve/Bracket, Disc Brakes, Chevy, Kit
Part Number: OPS-B6568PV4G
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
Front to Rear Brake Line - Fits 64-67 Chevelle/Malibu Hardtops - Galfan Coated Steel
Part Number: OPS-C6467MG
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
Full Car Brake Line Kit - Fits 64-67 Chevelle/Malibu Hardtops - Stainless - Valve/Bracket Included
Part Number: OPS-C6467PV2
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
Full Car Brake Line Kit - Fits 64-67 Chevelle/Malibu Convertible & El Camino - Stainless - Valve/Bracket Included
Part Number: OPS-C6467CONVPV2
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
65-68 Full Size Chevy Car. Brake line kit fits only power brakes and Pictured Valve. Includes Front Line Kit and Front to Rear Line
Part Number: OPS-B6568ADJ
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
65-68 Full Size Chevy Car. Brake line kit fits only power brakes with the included valve. Front Line Kit, Front to Rear Line, Valve and Bracket
Part Number: OPS-B6568ADJPV
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
Complete Galfan Coated Steel Brake Line Kit for Convertible Power Disc Vehicles using 1 piece aftermarket prop Valve. Valve included
Part Number: OPS-S0002
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
HOSE - RET
Part Number: EDD-80407
Not Yet Reviewed
Estimated Ship Date: Dec 2, 2025 if ordered today
Estimated Ship Date: Dec 2, 2025 if ordered today
Radiator Hose, Upper, Rubber, Black, 1 1/2 in. Ends, 15 3/4 in. Length, Jeep, 3.7L, Each
Part Number: CWA-J0942368
Not Yet Reviewed
Estimated Ship Date: Feb 9, 2026 if ordered today
Estimated Ship Date: Feb 9, 2026 if ordered today
Brake Hydraulic Line Kit
Part Number: EBC-BLA7126-3L
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
Brake Hose, Rubber, 18.00 in. Length, Center Front, Jeep, Each
Part Number: CWA-J0946550
Not Yet Reviewed
Estimated Ship Date: Feb 9, 2026 if ordered today
Estimated Ship Date: Feb 9, 2026 if ordered today
Radiator Hose, Upper, Rubber, Black, 1 1/2 in. Ends, 14 in. Length, Jeep, 2.2L F-head, Each
Part Number: CWA-J0906779
Not Yet Reviewed
Estimated Ship Date: Feb 9, 2026 if ordered today
Estimated Ship Date: Feb 9, 2026 if ordered today
FLEXIBLE RADIATOR HOSE (SAE 20R5)
Part Number: CEL-52410
Estimated Ship Date: Dec 4, 2025 if ordered today
Estimated Ship Date: Dec 4, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203412
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203537
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203919
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203021
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203037
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203221
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2203573
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.