Availability
Coolant Hose Connector, Radiator, Steel, Aluminized, 1.50 in. OD, 90 Degree Bend, Each
Part Number: SUM-380610
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Twist-Tite, Rubber, Blue, -6 AN, 20 ft. Length, Each
Part Number: SUM-220785
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Filler Hose, 1982-87 Chevy/GMC Truck,Fleetside, LH, Repl GM#14041209, Each
Part Number: SUM-RP23743
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, PTFE, Braided Stainless Steel, -6 AN, 3 ft. Length, Each
Part Number: SUM-220988
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Twist-Tite, Rubber, Black, -6 AN, 10 ft. Length, Each
Part Number: SUM-220783-B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Braided Nylon, Black, -8 AN, 15 ft. Length, Each
Part Number: SUM-240815B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Tubing, Aluminum, Natural, 1/4 in. x 25 ft., Each
Part Number: SUM-G2514X
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Radiator Hose, Plumbing, Universal, 1.75 in. ID, 45 Degree, 4 in. Legs, Silicone, Black, Each
Part Number: SUM-295037
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Radiator Hoses, Silicone, Blue, Ford, Kit
Part Number: SUM-391200
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Vacuum, Rubber, Black, 1/8 in. Diameter, 6 ft. Length, Each
Part Number: SUM-230161
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Brake Line, Braided Stainless, 10 in. Length, 90 Degree -3 AN Female, Straight -3 AN Female
Part Number: SUM-220309
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Automatic Transmission Cooler Lines, 5 Foot Length, Black, Braided Nylon, PTFE, 4L60, 700R4, TH350, TH400, Pair
Part Number: SUM-230322-BN
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Line, Braided Stainless Steel/Aluminum, Natural/Red/Blue Anodized, Holley, Ultra HP/XP, -8 AN Inlet, Each
Part Number: SUM-220131
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Premium Braided Nylon, Black, -8 AN, 6 ft. Length, Each
Part Number: SUM-240806BP
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
LS Coolant Steam Crossover Kit 2, Billet Aluminum, -4AN Braided Stainless Hose, Bypass Hose Kit, W/ Vent Front, Billet Plugs Rear, LS1, LSX, Kit
Part Number: SUM-220963
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, EFI, 5/16 in. Diameter, 3 ft. Length, 295 psi, Synthetic Twined Reinforced Rubber, SAE J30R9, Black, Each
Part Number: SUM-240431303
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose Sleeving, Braided Stainless Steel, Black Anodized Covers, Clamps, Kit
Part Number: SUM-350005
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Premium Braided Nylon, Black, -10 AN, 6 ft. Length, Each
Part Number: SUM-240006BP
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Tubing, Copper/Nickel, Hard Line, 1/2 in. Diameter, 25 ft. Length, Each
Part Number: SUM-220220-25X
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Heater Hose, Silicone, Black, 5/8 in. ID, 5 ft. Long, Each
Part Number: SUM-294021
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Brake Lines, Braided Stainless Steel, Ford, Set of 3
Part Number: SUM-220388
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Coolant Hose Connector, Radiator, Steel, Aluminized, 1.50 in. OD, Straight, Each
Part Number: SUM-380601
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, PTFE, Braided Stainless Steel, -8 AN, 6 ft. Length, Each
Part Number: SUM-220991
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Line, Braided Stainless Steel/Aluminum, Natural/Black Anodized, Holley, 4500, -8 AN Inlet, Kit
Part Number: SUM-220102B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Hose, Braided Stainless Steel, -12 AN, 3 ft. Length, Each
Part Number: SUM-230203
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.