Availability
71-72 Chevelle / Malibu Fuel Line
Part Number: FNL-CGL7137OM
Not Yet Reviewed
Estimated Ship Date: Dec 12, 2025 if ordered today
Estimated Ship Date: Dec 12, 2025 if ordered today
71-72 Chevelle / Malibu Fuel Line
Part Number: FNL-CGL7137SS
Not Yet Reviewed
Estimated Ship Date: Dec 12, 2025 if ordered today
Estimated Ship Date: Dec 12, 2025 if ordered today
71-72 El Camino Fuel Line
Part Number: FNL-CGL7185OM
Not Yet Reviewed
Estimated Ship Date: Dec 12, 2025 if ordered today
Estimated Ship Date: Dec 12, 2025 if ordered today
71-72 El Camino Fuel Line
Part Number: FNL-CGL7185SS
Not Yet Reviewed
Estimated Ship Date: Dec 12, 2025 if ordered today
Estimated Ship Date: Dec 12, 2025 if ordered today
Universal Braided Stainless Brake Hose, 18 in. Long, 7/16 in. Banjo, 3/8 in.-24 Inverted Female End, Pair
Part Number: OPS-HK1-18
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
68-72 Chevelle / Malibu Hardtop. Brake line kit fits only power brakes w/ the included valve. Includes Front Lines, Front to Rear Line, Valve/Bracket
Part Number: OPS-C1001ADJPV
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
68-72 Chevelle Convertible/El Camino. Brake line kit fits power brakes with included valve. Includes Front Line Kit, Front to Rear Line, Valve/Bracket
Part Number: OPS-C1000ADJPV
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
Fuel Line, Steel, Hard, Tank to Pump, 313 in. Chevy, Each
Part Number: CST-CEF1009-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Line, Stainless Steel, Hard, Tank to Pump, 313 in. Chevy, Each
Part Number: CST-CEF1009-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Steel, Chevy, Powerglide, TH350, Pair
Part Number: CST-CET1006-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Stainless Steel, Chevy, Powerglide, TH350, Pair
Part Number: CST-CET1006-SC
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, 5/16 in. Line Diameter, Chevy, Hardtop, Each
Part Number: CST-CEV1001-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1002-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1002-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, Chevy, Fits Hardtop Only, Each
Part Number: CST-CEV1004-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, Chevy, Fits Hardtop Only, Each
Part Number: CST-CEV1004-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1005-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Stainless Steel, Natural, 5/16 in. Line Diameter, Chevy, Convertible, Each
Part Number: CST-CEV1005-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Steel, Chevy, TH400, Pair
Part Number: CST-CET1004-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Stainless Steel, Chevy, TH400, Pair
Part Number: CST-CET1004-SC
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Steel, Chevy, TH350, Pair
Part Number: CST-CET1005-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Stainless Steel, Chevy, TH350, Pair
Part Number: CST-CET1005-SC
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Automatic Transmission Cooler Lines, Stainless Steel, Chevy, GMC, TH350, RWD Only, Pair
Part Number: CST-CTT1004-SC
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Lines, Stainless Steel, Natural, Chevy, GMC, 4WD, Set of 3
Part Number: CST-CTV1011-SS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Fuel Vapor Line, Steel, Natural, 5/16 in. Diameter, Chevy, V8, Each
Part Number: CST-MCV1003-OE
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.