Availability
Summit Racing Fittings & Hoses
Heater Hose, Stainless Steel Hose, Chrome, Aluminum Ends, 3/4 in. Diameter, 44 in. Length, Kit
Part Number: SUM-390144
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Tubing, Aluminum, Natural, 5/8 in. x 25 ft., Each
Part Number: SUM-G2558X
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Brake Line, 3/16 in. Diameter, Assembled, Stainless Steel, 40 in. Length, Each
Part Number: SUM-220204SS-40
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Hose Clamp, T-Bolt, Stainless Steel, Natural, 4.00 in. Diameter, Each
Part Number: SUM-260448
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Adapter, AN to NPT, Straight, Aluminum, Blue Anodized, -8 AN, 3/8 in. NPT, Each
Part Number: SUM-220846
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Bung, Weld-In, Female 1/8 in. NPT, Aluminum, Each
Part Number: SUM-220070
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Hose End, Straight, -10 AN Hose to Female -10 AN, Aluminum, Red/Blue Anodized, Each
Part Number: SUM-220090
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Hose, PTFE, Braided Stainless Steel Outer, Natural, -10 AN Size, 20 ft. Length, Each
Part Number: SUM-H2-10-20-SS
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Hose Mount, Clamp, Cushioned, Steel, Cadmium Plated, .375 in. O.D. Hose, Set of 10
Part Number: SUM-G1881
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Hose, Twist-Tite, Rubber, Black, -6 AN, 20 ft. Length, Each
Part Number: SUM-220785-B
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Tubing, Copper/Nickel, Hard Line, 1/4 in. Diameter, 25 ft. Length, Each
Part Number: SUM-220217-25X
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Brake Line, Braided Stainless, 12 in. Length, 90 Degree -3 AN Female, Straight -3 AN Female
Part Number: SUM-220310
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Bung, Weld-In, Female 3/8 in. NPT, Aluminum, Each
Part Number: SUM-220072
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Radiator Hose, Plumbing, Universal, 1.25 in. ID, 90 Degree, 5 in. Legs, Silicone, Black, Each
Part Number: SUM-295040
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Adapter, NPT to Metric, Straight, Aluminum, Natural, 1/8 in. NPT, M16 x 1.5, Each
Part Number: SUM-220126
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fuel System Plumbing Kit, Fuel Pressure Regulator to Fuel Filter, 3/8 in. Aluminum/-6 AN Braided Flex Line, Kit
Part Number: SUM-PUMPKIT6
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Tubing, Steel, Natural, 3/16 in. x 25 ft., Each
Part Number: SUM-220136
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Hose End, Straight, -6 AN Hose to Female -6 AN, Steel, Zinc, Each
Part Number: SUM-220141
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Bung, Weld-in, Aluminum, -16AN, Male Threads, Each
Part Number: SUM-2200616
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Hose End, Straight, -6 AN Hose to Female -6 AN, Aluminum, Nickel Plated, Each
Part Number: SUM-220690N
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Carburetor Feed Line, Steel, Chrome, Fits Holley 4150, Each
Part Number: SUM-G3098
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Hose, EFI, 5/16 in. Diameter, 10 ft. Length, 295 psi, Synthetic Twined Reinforced Rubber, SAE J30R9, Black, Each
Part Number: SUM-240431310
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Automatic Transmission Cooler Lines, 7 Ft. Length, Black, Braided Nylon, PTFE, 4L60, 700R4, TH350, TH400, Pair
Part Number: SUM-230320-BN
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Coupler, Union, AN to AN, Straight, Aluminum, Black Anodized, -8 AN, -8 AN, Each
Part Number: SUM-220832B
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Adapter, AN to Straight Cut, Straight, Aluminum, Black Anodized, -6 AN, -10 AN, Each
Part Number: SUM-220163B
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster