Availability
Rocker Arms, 1.6 Ratio, 3/8 in. Stud, Full Roller, Stainless Steel, Polished, Small Chevy, SBC, Set of 16
Part Number: SUM-G6991
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine Oil Dipstick, Flexible, Passenger Side Block Entry, Billet Aluminum, Brite Anodized, Chevy, Small Block, Each
Part Number: LOK-ED-5001
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Covers, Center and Perimeter Bolt, Tall, Chevy Logo, Cast Aluminum, Red Gloss, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-179
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Main Bearings, P Series, 1/2 Groove, Standard Size, Tri Metal, Chevy, Big Block, Set of 5
Part Number: CLE-MS829P
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller, Advertised Duration 312/316, Lift .595/.595, Lobe Sep. 110, Small Ford, 5.0L, Each
Part Number: TFS-51403005
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arm, 1.7 Ratio, Aluminum, Heavy Duty, Roller, fits 7/16 in. Studs, Chevy, Big Block, Kit
Part Number: CSP-SH2001
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rod Bearing, H Series, Coated, Standard Size, TM-77, Chevy, Small Block, Each
Part Number: CLE-CB663HNC
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crankshaft, 28 oz. External Balance, Cast Steel, 3.50 in. Stroke, Ford, 351W, Each
Part Number: SCA-9351W05
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rods, Performance, I-beam Style, Forged 4340 Steel, 6.125 in. Length Center To Center, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6125927I
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Summit E303 Plus Hyd. Roller Cam, 220/231 Duration, 113 LSA + 0 Adv, .550/.540 1.6 Ratio, 2500-6000 Range, 85-1996 Roller Block
Part Number: SUM-K8900
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, HRT Max Power Master, Stage 2, Hydraulic Roller, 1,900-6,700 RPM Range, 1-Bolt Gear Attachment, Dodge, Chrysler, Jeep, Gen III Hemi, Kit
Part Number: CCA-MK112-303-11
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, BTR, L83 Stage 2, 212 int., 223 exh Duration, 0.540 in./0.540 in. Lift, 111 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2241023116R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gears, True Roller, Double Roller, Steel Sprockets, Ford, FE, Set
Part Number: SUM-G6608R-9
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Gold Zinc, 4 qt., Mopar 1972- Up, 360, Each
Part Number: SUM-G3536
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Spring and Retainer Kits, Single, Std., 1.514 in. O.D., 348 lbs./in., 0.375 in. Dia. Valve Stem, Retainers, 10-Degree Locks, Damper Spring, Kit
Part Number: HRS-98636-K32
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine Oil Dipstick, Anchor-Tight Locking Flexible, Oil Pan Entry, Billet Aluminum, Brite Anodized, 24 in. Length, Universal, Each
Part Number: LOK-1220174-24
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valves, Exhaust, Stainless Steel, 1.600 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8
Part Number: SUM-V8010-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Springs, Single, 1.415 in. Outside Diameter, 280 lbs./in. Rate, 1.060 in. Coil Bind Height, Set of 16
Part Number: CCA-26986-16
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine Rotating Assembly, Competition, Forged Crank, Forged Pistons, H-Beam Rods, Chevy, Small Block, Kit
Part Number: ESP-B12111030
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Ford, Small Block, For use with 1-Piece Fuel Pump Eccentric, Set
Part Number: SUM-G6620R-B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Belt Kit, Water Pump, for use with Honda®/Acura®, V6, Kit
Part Number: ASN-TKH-002
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.900 in. Length, Universal, Set of 16
Part Number: SUM-1457900
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rear Main Seal Cover, Aluminum, Natural, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Saab, Kit
Part Number: RNB-635-518
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, Blue Hornet, 18-Degree,175cc Intake Runner, As Cast, 62cc Chamber, Bare, V8, Mopar, Small Block LA, Chrysler, Dodge, Plymouth, Each
Part Number: AFR-2402
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Head Combo, GenX® Top-End, 580hp, 520 ft-lbs. Torque, GM, LS3, Square Port, Kit
Part Number: TFS-K326-580-520
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.