Availability
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, Chevy LS, .001 Extra Clearance, Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HXCS
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Main Bearings, Race Series, Tri-Metal, 1/2 Groove, Standard Size, Chrysler, Dodge, Hemi, Set of 5
Part Number: PEB-5M2220H-STD
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Timing Chain and Gears, Double Roller, Billet Steel Sprockets, Chevy, Big Block, Set
Part Number: CLO-9-3610TX9Z
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Springs, PAC Racing, Dual, 1.460 in. Outside Diameter, 391 lbs./in. Rate, 1.050 in. Coil Bind, Set of 16
Part Number: TFS-16893-16
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pump; High Volume Racing Oil Pump; LS-1 High Volume Wet Sump; Clear Anodized Coating
Part Number: MOR-22120
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Piston Rings, Pro GPX Gas Ported, 4.125 in. Bore, File Fit, Gas Nitrided, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP412515
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Gears, 1-Piece/2-Piece Eccentric, Ford, 429/460, Set
Part Number: SUM-G6631R-B
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 298/309, Lift .612/.612, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8702-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS 2618 Forged Piston, 4.000 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943400012
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Muscle Car Camshaft, 350HP350, Hydraulic Flat Tappet, 2,000-4,800 RPM Range, Adv.292 int./288 exh., Lift 450 int./460 exh., Chevy, Each
Part Number: SUM-1122
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Bellhousing Dowel Pins, .625 in. Diameter, .007 in. Offset, Buick, Chevy, Oldsmobile, Pontiac, Pair
Part Number: SUM-192005
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Steel, Spin-On Filter, Chrome, 7 Qt. Capacity, Chevy, LS, Kit
Part Number: SUM-G3612C-K
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 282/282, Lift .498/.498, Ford, Small Block, Kit
Part Number: SUM-K30092
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS Rotating Assembly, 325 Cid., 3.780 bore, Standard 3.622 stroke, 24X, 6.098 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R24367807
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Engine Re-Ring, 4.030 in. Bore, .010 in. Rod, .010 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-311
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Drag Race, Steel, 5 qt., Rear Sump, Chevy, Small Block, Each
Part Number: CTR-13-080
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Springs, 1300 Series Drag Race, Dual, 1.625 in. O.D., 629 lbs./in. Rate, 1.100 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1328-16
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Main Bearings, Race Series, Tri-Metal, 1/2 Groove, Standard Size, Mazda, Set of 5
Part Number: PEB-5M8353H-STD
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 3/8 in. Stud, Chevy Small Block, Set of 16
Part Number: SUM-G6936-16
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/282, Lift .545/.545, Chevy, LS, Each
Part Number: SUM-8714-1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Springs, PAC Racing, Single, 1.437 in. Outside Diameter, 340 lbs./in. Rate, 1.150 in. Coil Bind, Set 16
Part Number: TFS-16942-16
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Summit Racing™ Stage 4 Pro LS Single Plane Cam, 240/252 106 +0, .569 Lift, LS1 LS2 LS6 LS3 LS7 LQ4, Each
Part Number: SUM-8703
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Main Cap Girdle, Steel, Black Oxide, Ford, 429/460, Kit
Part Number: CTR-21-066
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Windage Tray, Steel, Clear Zinc, Screened, Front Sump, Ford, Big Block, Each
Part Number: CTR-20-938
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Main Cap Girdle, Stroker Clearanced, Laser Cut 1/2 in. Steel, with Hardware, Steel, Black Oxide, Ford, 289/302, Kit
Part Number: CTR-21-060
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.