Availability
Engines & Engine Parts
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 276/276, Lift .533/.533, Ford, 352-428 FE, Kit
Part Number: SUM-K34052
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS Rotating Assembly, 326 Cid, 3.785 bore, Standard 3.622 stroke, 58x, 6.125 rod, 2cc dome, 10.9:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Ring, H Bearing
Part Number: SUM-R5836L7852
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Big Block, Kit
Part Number: SUM-PANKIT12
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifter kit, Summit B303 Plus Hyd. Roller Cam, 224/232 Duration, 114 LSA + 3 Adv, .550/.540 1.6 Ratio, 2800-6300 Range, '85-1996 Roller Block
Part Number: SUM-K8901
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 292/304, Lift .540/.540, Chevy, Big Block, Kit
Part Number: SUM-K1302
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/298, Lift .466/.466, Chevy, Small Block, Kit
Part Number: SUM-K1104
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
PRO BBC H.R. 9 Hydraulic Roller Cam, 4/7 Swap, 255/264 Duration @ .050, 112 LSA + 7.5 Adv. , .700/.700 with 1.7 ratio, .741/.741 with 1.8, 4000-6900
Part Number: SUM-1259
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3603
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Water Pump Pulley, V-Belt, 1-Groove, Steel, Black, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3954B
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifter kit, Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7,9 LSA LSX
Part Number: SUM-K8709R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-K8710R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Combo, Summit® SFI Flexplate 168-Tooth, Harmonic Balancer, Summit®, Cast, Flexplate Bolts, Chevy, 265-350, Kit
Part Number: CMB-13-0084
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 280/289, Lift .449/.473, Ford, Small Block, Each
Part Number: SUM-3600
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS 4340 Piston and Rod Kit, 403 Cid., 4.005 bore, 4.000 stroke, 6.125 rod, 8cc dish, 11:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR400058
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Alternator Pulley, V-Belt, 2-Groove, 0.664 in. Bore, 2.625 in. Diameter, Steel, Chrome, Each
Part Number: SUM-G3949
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 284/284, Lift .519/.519, Chevy, Big Block, Each
Part Number: SUM-1066
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Combo, TCI Flexplate 168-Tooth, Summit OEM Balancer, Summit-ARP Bolts, Chevy 1986-94, 5.0, 5.7L, Kit
Part Number: CMB-08-0001
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
SBF 302 Windsor Cast crank, 3.400 in. stroke, 5.400 rod, Nitride Hardened, External 28 0z. Balance, Req. Narrowed Rod bearings
Part Number: SUM-SBF3023400C
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-1DS
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC63852H
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Water Pump Pulley, V-belt, 2-groove, Steel, Chrome, 5.875 in. O.D., Ford, Mercury, 289, Each
Part Number: SUM-329810
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS Rotating Assembly, 365 Cid., 4.005 bore, 3.622 stroke, 24X, 6.098 rod, 2cc Flat Top, 10.8:1 @ 65cc, 10.2:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24360052
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, 5/8 Pilot, Steel, Chrome, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3951
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 360 Cid., 3.785 bore, 4.000 stroke, 24X, 6.125 rod, 5cc dish, 10.9:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings, H Bearings
Part Number: SUM-R24407855
Not Yet Reviewed
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Estimated Ship Date: Monday 3/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster