Availability
2018 Camshafts & Valvetrain
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-1DT
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Hydraulic Roller Lifter Guide, 4 Lifter Yoke, Hemi, Non-MDS, Chrysler, Dodge, Jeep, RAM, Each
Part Number: CCA-8561-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
6.4 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5725
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
6.4 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5726
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Valve Spring Retainers, OE Replacement, Steel, Chrysler, Dodge, Jeep, Ram, Gen III Hemi, Viper V10, Each
Part Number: MOP-53021676AB
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
SPROCKET
Part Number: MEL-S827
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Phasers, Chrysler, Dodge, Jeep, Ram, Each
Part Number: RNB-918-880
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 269/273, Lift .525/.532, Chevy, Kit
Part Number: CCA-K54-414-11
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 259/265, Lift .515/.522, Chevy, Kit
Part Number: CCA-K54-408-11
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Ghost Cam. 222/234 115+3, .600/.575 Lift, Ultimate Stealth Cam, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Kit
Part Number: SUM-K8715R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Phaser, Steel, Ford, Lincoln, Each
Part Number: RNB-916-552
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifter, Short Travel XD, Hydraulic Roller, Vertical Link, 0.842 in. Diameter, Seat Height 2.660 in., GEN III/IV LS, Chevy, Pair
Part Number: CCA-15956XD-2
Not Yet Reviewed
Estimated Ship Date: Apr 22, 2026 if ordered today
Estimated Ship Date: Apr 22, 2026 if ordered today
Camshaft, Hydraulic Roller Tappet, Advertised Duration 260/264, Lift .522/.525, Mopar, 5.7/6.1L, Hemi, Each
Part Number: CCA-112-500-11
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Advertised Duration 273/277, Lift .547/.550, Mopar, 5.7/6.1L, Hemi, Each
Part Number: CCA-112-502-11
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Spring Kit, Platinum, Dual, Standard, Steel Retainer, 0.060 in. Thick, 377 lbs./in., Dart/RHS Valve Guides, Kit
Part Number: BTC-SK001S2060BB
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
LSX Valve Spring and Retainer Kit, Dual Per Valve, 1.310 in. OD, 392 lbs./in. Rate, Titanium Retainers, Kit
Part Number: LPE-L230075897
Not Yet Reviewed
Estimated Ship Date: Apr 27, 2026 if ordered today
Estimated Ship Date: Apr 27, 2026 if ordered today
Engine Variable Valve Timing (VVT) Sprocket, Camshaft Sprocket Actuator
Part Number: MEL-VCTA-1007H
Not Yet Reviewed
Estimated Ship Date: Mar 26, 2026 if ordered today
Estimated Ship Date: Mar 26, 2026 if ordered today
ARM ENG VALVE ROCKER
Part Number: MEL-MR-913
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft
Part Number: CWA-5184379AH
Not Yet Reviewed
Estimated Ship Date: May 27, 2026 if ordered today
Estimated Ship Date: May 27, 2026 if ordered today
Engine Variable Valve Timing (VVT) Sprocket Bolt
Part Number: CLO-VCB119
Not Yet Reviewed
Estimated Ship Date: Mar 16, 2026 if ordered today
Estimated Ship Date: Mar 16, 2026 if ordered today
TIMING SET, TIMING SET
Part Number: MEL-3-1049SAH
Not Yet Reviewed
Estimated Ship Date: Mar 26, 2026 if ordered today
Estimated Ship Date: Mar 26, 2026 if ordered today
SUM-8727 Pro LS Truck Torkinator Level 1 Cam Kit, Dual Springs, Seals, 200/205 Dur., 113 +4, .550/.550 Lift, 3-Bolt, 4.8, 5.3, 6.0 , 6.2 Vortec Truck
Part Number: SUM-8727-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster