Selected Filters


Loading...

Availability


2018 Summit Racing Engines & Components

Individual Parts

Results 126 - 150 of 565

Lifter Guide, Hydraulic Roller Style, Plastic, Chevy, LS, Non AFM/DOD engines, Each

Part Number: SUM-150132

4.5 out of 5 stars ( 20 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Kit

Part Number: CMB-09-0038

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.005 bore, 1.326 C.H., 2cc Flat, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9,

Part Number: SUM-3269454005-2

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.065 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8

Part Number: SUM-299927406512

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Oil Pump Pro LS, Standard-Volume, Standard-Pressure w/Optional High-Pressure Shim, O-ring to block seal, Fits GM Gen III/IV LS Engines, Each

Part Number: SUM-121171-OR

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.070 bore, 1.110 C.H., 21cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8

Part Number: SUM-110927407021

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Camshaft, 2011-20 6.4 Charger, Challenger Durango Grand Cherokee VVT, Replaces MDS 05038419AB with no MDS, 273/276 Adv. Dur., 0.582/0.546 Lift, Each.

Part Number: SUM-5703

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.040 bore, 1.299 C.H., 2cc Flat, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8

Part Number: SUM-2999274040-2

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.005 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8

Part Number: SUM-299927400512

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Summit Factory Performance Stage 1 LS Circle Track Cam, 225/236 110+1, .525/.525 Lift, Vortec LS1 LS2 LS6 LS3 LQ4, Summit's version of the ASA Cam

Part Number: SUM-8700

4.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.000 bore, 1.110 C.H., 20cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8

Part Number: SUM-110927400020

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

LS Cylinder Head, 5.3L Specific, 64cc Chamber, 2.000 Int. Valve, Permanent Mold A-356, Manganese Guides, Ductile Seats, PAC Springs, 21 4N Stainless

Part Number: SUM-LS210CATH64

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.080 bore, 1.110 C.H., 6cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8

Part Number: SUM-1109274080-6

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS CT1, 234/248 Duration, 113.5 LSA + 3.5 Adv, .550I/.550E Lift, 3-Bolt, Compatible with SUM-174002 LS6 Springs. 5.3, 5.7, 6.0, 6.2, 7.0

Part Number: SUM-8735R1

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 24X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.

Part Number: SUM-180LS362224

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Forged Pro Ford Mod Motor 4340 Forged Steel H-Beam Connecting Rod, 5.933 in. Length, .866 Floating Pin, ARP 8740 12 pt. Bolts, Set of 8

Part Number: SUM-MOD59332H

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Oil Cooler Bypass Block-Off Plate, Billet Aluminum, Clear Anodized, With Single 90* 1/8 in. NPT Ports, Chevy, LS, Each

Part Number: SUM-121028

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Valve Covers, Tall Height, Cast Aluminum, Natural, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair

Part Number: SUM-440360

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/282, Lift .545/.545, Chevy, LS, Each

Part Number: SUM-8714-1

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.070 bore, 1.299 C.H., 2cc Dome, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2L LS3 L92 LS9, Set of 8

Part Number: SUM-2999274070-2

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Pro LS 2618 Forged Piston, 4.040 bore, 1.326 C.H., 2cc Flat, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8

Part Number: SUM-3269434040-2

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Stage 4 Pro LS Turbo Cam. 238/234 117+5, .625/.600 Lift, 2 deg. Overlap, Maximum Power for larger 364+ CID. 6.0, 6.2, 7.0L, LS2 LS3 LS7 LQ4 LQ9

Part Number: SUM-8717R1

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Gen. 3 Hemi Cylinder head, 5.7 or 6.1L, 185cc as-cast intake runner,69cc CNC combustion chamber, 2.050 Int./1.590 exh.,600 Lift, 2.42 CSA Dr. Side,

Part Number: SUM-HEMI1855761D

Not Yet Reviewed

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Plug Fitting, LS Oil Pan Pressure Relief Valve, 14mm x 1.5 Size, Male Threads, Internal Allen Head, Crush Washer, Aluminum, Black, Each

Part Number: SUM-01-3454

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air

Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 210/218 Dur.@ .050 112 LSA +1 Adv. Lift .500/.500, Chevy GM, LS/LSX, Gen III/IV, Each

Part Number: SUM-8712-1

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/2/2026 if shipped by air