Availability
2017 Engines & Components
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Chevy, LS, Set of 16
Part Number: SME-143002
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Filter Components, Aluminum Oil Filter Housing, Kit
Part Number: MIO-MMOFH-JK-12
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Springs, Beehive, Single, 1.307 in. O.D., 1.800 in. Installed height, 340 lbs./in. Rate, 1.100 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1219-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Galley Barbell Plug, OEM-Style, Billet Aluminum, Viton® O-Rings, Chevy, LS, Each
Part Number: IRP-EGM-501
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Aluminum LS, Center and Perimeter Bolt, Tall, Chevy Logo, Cast Aluminum, Orange Gloss, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-178
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, HRT Stage 1, Hydraulic Roller, 1,700-6,500 Range, 0.520./0.515 Lift, 114 LSA, Dodge, Chrysler, Jeep, RAM, Hemi, Each
Part Number: CCA-201-300-17
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Accessory Drive Systems, LS Chevy S-Drive Serpentine Pulley Drive Systems, Power Steering Pump, Polished Pulleys, Chevrolet, Small Block LS, Kit
Part Number: EMS-MS117-90BP
Estimated Ship Date: Mar 23, 2026 if ordered today
Estimated Ship Date: Mar 23, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Eddie Motorsports Raven Series LS Chevy S-Drive Serpentine Pulley Drive Systems MS118-90BK
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026
Timing Belt Kit, Water Pump, for use with Honda®/Acura®, V6, Kit
Part Number: ASN-TKH-002
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head, GenX® 225, CNC Competition Ported, Assembled, 65cc CNC Chambers, Ti Retainers, GM LS2, Each
Part Number: TFS-3061T001-C02
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 416 Cid., 4.070 bore, 4.000 stroke, 58x, 6.125 rod, 21cc dish, 9.9:1 @ 65cc, 9.5:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R584007021
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rod Bearings, HP-Series, Standard Size, Bi-metal, Silicon Aluminum, Large Journal, Chevy, Small Block, Set of 8
Part Number: KGB-CR807HPN
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Connecting Rod Bolts, Pro Series, 2000 Alloy, Chevy, LS, Kit
Part Number: ARP-234-6301
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gear Sets, Camshaft Drive Kit, Tensioners, Guides, Chains, VCT Phasers, Hardware, Ford, Kit
Part Number: FMS-M-6004-A5015
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pistons, Pro LS 2618 Forged, 4.030 bore, Flat top, 3.622 in. Stroke, 6.098 Rod, Set of 8
Part Number: SUM-3269454030-2
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point Head, Black Oxide, Chevy, 4.8, 5.3, 5.7, 6.0L, 2004-up, Kit
Part Number: SUM-910501
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head Studs, Custom Age, 12-Point Head, Dodge, Cummins Diesel, 24 Valve, Kit
Part Number: ARP-247-4204
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS362258X
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rear Main Seal Cover, Aluminum, Natural, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Saab, Kit
Part Number: RNB-635-518
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifter, Factory Hydraulic Roller, AFM, Chevy, Each
Part Number: MEL-JB-8011
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Accessory Drive Systems, LT Mid-Mount, Serpentine, Alternator, Power Steering, Water Pump, Belts, Damper, Black Finish, GM, Gen V, 5.3L, 6.2L, Kit
Part Number: HLY-20-205BK
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Oil Dipstick, Flexible Black Braided Stainless Steel, Billet Aluminum Handle, Black Anodized, Chevy, Small Block, LS, Truck, Each
Part Number: LOK-XED-5019
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-299927403012
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster