Availability
2017 Engines & Components
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, DOD Delete, 1-Bolt, Hydraulic Roller, GM LS Truck, Each
Part Number: NAL-12689035
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifters/Trays/Bolts, Hydraulic Roller, Chevy, LS Gen. 3 and 4, Gen. 5 LT, Kit
Part Number: SUM-HTLSKIT3
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Filter Components, Aluminum Oil Filter Housing, Kit
Part Number: MIO-MMOFH-JK-12
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point Head, Black Oxide, Chevy, 4.8, 5.3, 5.7, 6.0L, 2004-up, Kit
Part Number: SUM-910501
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, 09-21 5.7 Dodge RAM, replaces 53022314AD, VVT but no MDS, 252/271 Advertised Duration, 0.539/0.493 Lift, Dodge, Ram, Each
Part Number: SUM-5701
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .523/.524, Chevy GM, LS/LSX, Gen III/IV, LS, Kit
Part Number: SUM-8701-1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, BTR, Stage 2 Truck V2, No Springs Required, 212 int./218 exh. Duration, 0.480 in./0.480 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-31218110NSR
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Accessory Bolts, 12-point, Chromoly, Black Oxide, Chevy, Small Block LS, Kit
Part Number: ARP-534-9705
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Springs, 1200 Series Drag Race, Beehive, Single, 0.551 in. Maximum Valve Lift, 245 lbs./in. Rate, Ford, 5.0L Modular V8, Set of 16
Part Number: RSC-PAC-1281X-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Harmonic Balancer, Race Performance, Cadillac, Chevy, Pontiac, 5.7, 6.0, 6.2L, Each
Part Number: PBB-PB1117SS
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, BTR, L83 Stage 2, 212 int., 223 exh Duration, 0.540 in./0.540 in. Lift, 111 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2241023116R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Harmonic Balancer, Standard, Aluminum, Black, Internal Balance, 6.78 in. Diameter, Chrysler, Dodge, Jeep, 5.7L
Part Number: ATI-918459
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Nano-Peened Dual Valve springs, Titanium retainers, 160 lbs. seat pressure. 425 lbs. open at .670 lift. LS1, LS6, LS2, LS3, LQ4, LQ9, L92, Kit
Part Number: TFS-2500287P
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Connecting Rods, SIR I-Beam, Forged 5140 Steel, 6.100 in. Length Center To Center, Chevrolet, Small Block LS, Set of 8
Part Number: ESP-SIR6100MLW
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Springs, RPM Series, Dual, 1.324 in. O.D., 500 lbs./in. Rate, 1.000 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1209X-16
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Variable Valve Timing Delete Combo, 3-bolt, Cam Sprocket, Timing Cover, Chevy, LS, Kit
Part Number: TFS-30678505
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshafts, BTR, LS3 Stage 3 V2, 227 int. Duration, 0.636 int./0.636 exh. Lift, 111.5 LSA, 3-Bolt, Chevy, LS3, 6.2L, Each
Part Number: BTC-BTRLS3STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pans, Engine Swap, Low Profile, Aluminum, Black, 4.250 in. Stroke, 5.5 Quarts, Chevy, LS, 4.8L, 5.3L, 5.7L, .0L, 6.2L, Kit
Part Number: TSN-81074BK
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8722R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster