Availability
Pro LS 2618 Forged Piston, 3.820 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273820-5
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Valve Covers, LS Ford Style, Cast Aluminum, Center Bolt, Plain, Cast Aluminum, Polished Finish, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-186
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.299 C.H., 2cc dome, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273820-2
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Dual Keyway, Black Anodized, SFI 18.1, Ford, 5.0L Modular
Part Number: ATI-918048
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 260/264, Lift .522/.525, Mopar, 5.7/6.1L, Hemi, Each
Part Number: CCA-112-500-11
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam and Lifter kit, Stage 2 Pro LS Cam, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, LS1,2,6,3,LSX, Each
Part Number: SUM-K8706R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Oil Pan, Road Race Series Wet Sump, Steel, Zinc, Front Sump, 7 Qt., Driver Side Dipstick, Ford, Modular V8, Each
Part Number: CTR-15-738
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Aluminum/Steel, Natural, Internal Engine Balance, 6-rib Pulley, SFI 18.1, 6.500 in. O.D., Ford, 5.0L, Each
Part Number: INW-817
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cylinder Heads, Remanufactured, Assembled, Aluminum, Natural, Left, Chrysler, Dodge, Jeep, Ram, 5.7L, Each
Part Number: VRE-2DM2L
Not Yet Reviewed
Estimated Ship Date: Nov 10, 2025 if ordered today
Estimated Ship Date: Nov 10, 2025 if ordered today
Rocker Arms, Upgraded Trunnion, Stud Mount, 1.8 Ratio, Roller Fulcrum, Steel, Black Oxide, Chevy, LS7, Set of 16
Part Number: CCA-1479-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft; LS Camshaft; Hyd. Roller; 2400-7200rpm; Adv. Dur. 289 Int./305 Exh.; Valve Lift .624 Int./.624 Exh.
Part Number: CCA-54-471-11
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Supercharged Series, Internal Balance, Aluminum/Steel, 6 percent Overdriven, Chevy, 6.2L LS3
Part Number: ATI-918625
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, 90 Degree V6, Set of 6
Part Number: ESP-570063D
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Piston, 4.070 bore, 1.299 C.H., 2cc Dome, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2L LS3 L92 LS9, Set of 8
Part Number: SUM-2999274070-2
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Connecting Rods, CRS 4340 H-Beam, 6.243 in. Length, 0.927 in. Pin Diameter, Cap Screw, Bushed, Dodge, Chrysler, Ram, Hemi Gen III, Set of 8
Part Number: ESP-CRS6243H3D
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8716-1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam and Lifter kit, Stage 5.5 Pro LS Twin-Turbo Cam. 251/255 Dur., 117 + 6, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-K8726R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Oil Pump, High-Volume, High-Pressure, Ford, Lincoln, Mercury, Each
Part Number: MEL-10176HV
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 266/279, Lift .612/.605, Dodge, Hemi, 5.7/6.4L, Each
Part Number: CCA-201-424-17
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 269/273, Lift .525/.532, Chevy, Small Block, LS
Part Number: CCA-54-414-11
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Super Damper Serpentine Series, Internal Balance, Aluminum, Black Zinc Chromate, Ford, 5.0L, Each
Part Number: ATI-918053
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 285/293, Lift .621/.624, Chevy, Small Block, LS
Part Number: CCA-54-460-11
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Valve Covers, Cast Aluminum, 409 Chevy Style for LS, 409 Decals, Breather Tube, 2.750 in Tall, Natural, Centerbolt, Gen 3/4, Chevy, Pair
Part Number: LSS-GMLS1004
Estimated Ship Date: Oct 13, 2025 if ordered today
Estimated Ship Date: Oct 13, 2025 if ordered today
Valve Covers, Aluminum LS, Center and Perimeter Bolt, Tall, Finned, Cast Aluminum, Natural Finish, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-180
Not Yet Reviewed
Estimated Ship Date: Oct 13, 2025 if ordered today
Estimated Ship Date: Oct 13, 2025 if ordered today
Piston and Ring Kit, Powerpak, Flat Top, 4.070 in. Bore, 3.622 in. Stroke, Forged Aluminum, Chevy, LS, Set of 8
Part Number: MLE-930227870
Not Yet Reviewed
Estimated Ship Date: Oct 15, 2025 if ordered today
Estimated Ship Date: Oct 15, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.