Availability
Engine Hardware Kit, Brass Freeze Plugs, Main Cap Side Bolts, Chevy, LS, Kit
Part Number: SUM-G1585
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Engine Valley Cover, Aluminum, Black Powdercoated, Finned, Chevy GM, LS/LSX, Gen III, Each
Part Number: SUM-240058B
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 299/311, Lift .569/.569, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8703-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 4X, Single Row, 0.010 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6644-4X-010
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 Extra Clearance for .010 undersize, set
Part Number: SUM-663H009
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 undersize (thicker), set
Part Number: SUM-663H001
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Oil Pan Fasteners, LS Stainless Steel Oil Pan Bolt Sets, Flanged Hex Head, Stainless Steel, Natural, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-910266
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Oil Filter, Canister, 22mm x 1.5 Thread, 3.740 in. High, Each
Part Number: SUM-127005
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .010 undersize (thicker), Racing 270 Deg. Oil groove, set
Part Number: SUM-7298H10
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Oil Filter, Canister, 22mm x 1.5 Thread, 4.090 in. High, Each
Part Number: SUM-127002
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi Standard Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HS
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Rocker Arm, 1.7 Ratio, Roller Fulcrum, Ductile Iron, Intake Only,Chevy GM, LS/LSX, Gen III/IV, Ofset, Each
Part Number: SUM-141551
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 222/232 Dur.@ .050 112 LSA +5 Adv. Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8713-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, Chevy LS, .001 Extra Clearance, Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HXCS
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Rocker Arm, Heavy Duty, 1.7 Ratio, Roller Fulcrum, Ductile Iron, Offset Intake Only, L92/LS9/LS3, GEN IV LS GM Each
Part Number: SUM-141554I-1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 24X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362224
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS Piston and Rod Kit, 370 Cid., 4.030 bore, 3.622 stroke, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR360302
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS Piston and Rod Kit, 364 Cid., 4.000 bore, 3.622 stroke, 6.125 rod, 2cc Flat Top, 10.7:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L0002
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cam and Lifter kit, Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7, LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-K8707R1
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Cylinder Head Stud, Chromoly, Extreme Duty, 12-Point Nuts, Chevy, 6.6L/400, Diesel, LB-7, LLY, Kit
Part Number: SUM-910521
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
SUM-8728 Pro LS Big Truck Torkinator Level 1 Cam Kit, Beehive Springs, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943403012
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Cam and Lifter kit, Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-K8720R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, Standard Clearance, Standard 120 Deg. Oil groove, set
Part Number: SUM-7299HS
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, GM LS Gen III/IV, Chevy, Set of 16
Part Number: SUM-HT223-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.