Availability
2002 Summit Racing Engines & Components
Cam and Lifter kit, Stage 5 Pro LS Twin-Turbo Cam. 247/251 Dur., 117.5+5.5, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-K8725R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Solid Roller Cam 4, 258 Int. / 270 Exh., 113 LSA + 3 Adv., .707/.707 lift with 1.7 rocker, .749/.749 with 1.8 with SUM-174012DP-16 Springs
Part Number: SUM-8700SR4
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Rotating Assembly, 326 Cid., 3.785 bore, Standard 3.622 stroke, 58x, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R5836L7857
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 359 Cid., 3.780 bore, 4.000 stroke, 24X, 6.125 rod, 5cc dish, 10.9:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings, H Bearings
Part Number: SUM-R24407805
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 371 Cid., 4.040 bore, 3.622 stroke, 24X, 6.098 rod, 12cc dish, 9.8:1 @ 65cc, 9.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R243604012
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
SUM-8723 Level 1 Cam kit, Beehive Springs, Seals, Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0
Part Number: SUM-8723-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Rotating Assembly, 371 Cid., 4.040 bore, 3.622 stroke, 58x, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R58360402
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
SUM-8724 Level 1 Cam Kit, Dual Springs, St. Ret., Pro LS Stage 4.5 Twin-Turbo Cam. 242/248 Dur., 116+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2
Part Number: SUM-8724-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Subaru EJ18,20,22,25,20T,20TT,22T,25T thrust #5 Standard Size Coated, Set
Part Number: SUM-8309HCS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Subaru EJ15,16,18,20,22,25,20T,20TT,22T,25T thrust #3 .010 Undersize, Set
Part Number: SUM-8297H010
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Solid Roller Cam 3 SP, 252 Int. / 264 Exh., 109 LSA + 3 Adv., .707/.707 lift with 1.7 rocker, .749/.749 with 1.8 with SUM-174012DP-16 Springs
Part Number: SUM-8700SR3SP
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel H-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Each
Part Number: SUM-MOP61238H-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Solid Roller Cam 3, 252 Int. / 264 Exh., 113 LSA + 3 Adv., .707/.707 lift with 1.7 rocker, .749/.749 with 1.8 with SUM-174012DP-16 Springs
Part Number: SUM-8700SR3
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rod Bearing, Suzuki Hayabusa 1299cc .001 Undersize, Set
Part Number: SUM-8431H1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, .001 undersize (thicker), set
Part Number: SUM-1227HC01
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar SB, .001 Extra Clearance, set
Part Number: SUM-481HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Toyota 1AZ-FE, 2AZ-FE, 2AZ-FXE Standard Size Extra Clearance, Set
Part Number: SUM-8412HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Mazda B6/T, BP/T, ZL-VE, ZM-DE .001 Undersize, Set
Part Number: SUM-8353H1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Toyota 1JZGE,1JZGTE,2JZGE,2JZGTE Standard Size Coated, Set
Part Number: SUM-8103HCS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Honda J32,J35,J37 .010 Undersize, Set
Part Number: SUM-1996H010
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Subaru EJ18,20,22,25,20T,20TT,22T,25T thrust #5 Standard Size Extra Clearance, Set
Part Number: SUM-8309HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Honda B16A,B17A1,B18A1,B1,2,C1,2,5,7,B20B,Z,K20A2,3,Z1,K24A,Z1 .001 Undersize, Set
Part Number: SUM-1959H1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Nissan VK45,VK50,VK56 Standard Size, Set
Part Number: SUM-2995HS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Mitsubishi 4G91, 4G92, 4G93 .010 Undersize, Set
Part Number: SUM-8037H010
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Main Bearing, Toyota 2ZZ-GE .001 Undersize, Set
Part Number: SUM-1857H1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster