Availability
2002 Summit Racing Engines & Components
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 222/232 Dur.@ .050 112 LSA +5 Adv. Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8713-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Pro LS 4340 Piston and Rod Kit, 346 Cid., 3.898 bore, 3.622 stroke, 6.125 rod, 7cc dish, 9.7:1 @ 65cc, 9.4:1 @ 68cc, File-Fit Rings
Part Number: SUM-PR36L8987
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .011 undersize (thicker), Half-Upper groove, set
Part Number: SUM-909H011
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943780-7F
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-299S274000-2
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Piston and Rod Kit, 365 Cid., 4.005 bore, 3.622 stroke, 6.125 rod, 2cc Flat Top, 10.8:1 @ 65cc, 10.2:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L0052
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 Extra Clearance for .010 undersize, set
Part Number: SUM-663H009
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision Cam Bearings, SB Chevy aftermarket blocks with 1.999/2.001 on all five bores
Part Number: SUM-5C3346CS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro SBC CT2 Hydraulic Roller Cam 1, LS Firing Order, 238/254 Dur., 109 LSA, +4 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift, 1.6, Roller Block
Part Number: SUM-8816SN
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Crate Engine, High Torque, Iron Block, Non-Vortec Aluminum Heads, 6.2L/377, 9.1:1 CR, Hydraulic Roller, 1-Piece, Straight, Small Block, Chevy, Each
Part Number: XYZ-377HGTQ
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Crank and Rods, Forged 4340 Steel Crank, 4 in. Stroke, Forged 4340 Steel H-Beam Rods, 6.125 in. Rod Length, Chevy, LS, Kit
Part Number: SUM-CR4024125
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, Chevy LS, .010 undersize (thicker), Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HC10
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main .001 undersize (thicker), Half-Upper groove, set
Part Number: SUM-909HC001
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, Duramax Pro 1 Cam, 184/187 Duration @.050 in., 105.5 LSA, +2 advanced., Intake .389/Exhaust .392 Lift, Revised Firing Order, Each
Part Number: SUM-9001R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6811G
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Oil Fill Cap, Screw-In, Billet Aluminum, Black Anodized, -16 AN, Chevrolet, V8, LS, Each
Part Number: SUM-440368B
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main .001 Extra Clearance, Half-Upper groove, set
Part Number: SUM-909HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 Extra Clearance for .010 undersize, Half-Upper groove, set
Part Number: SUM-909H009
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro SB Chrysler Magnum Best Hydraulic Roller Cam 3, 224/236 Duration, 112 LSA + 3 Adv. .550/.550 lift 1.6 ratio, .624/.624 1.7 ratio, 3,200-6,800 rpm
Part Number: SUM-5777
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 undersize (thicker), Half-Upper groove, set
Part Number: SUM-909H001
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .002 undersize (thicker), Racing 270 Deg. Oil groove, set
Part Number: SUM-7298H02
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, 3000-7000 RPM Range
Part Number: SUM-K1226
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Piston and Rod Kit, 330 Cid., 3.810 bore, Standard 3.622 stroke, 6.098 rod, 2cc dome, 11:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR368102
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Piston and Rod Kit, 330 Cid., 3.810 bore, Standard 3.622 stroke, 6.098 rod, 7cc dish, 9.8:1 @ 61cc, 9.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR368107
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.810 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273810-5
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster