Availability
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Ford 4.6, 5.0, 5.4L, Mod, Narrowed, .001 Extra Clearance, set
Part Number: SUM-1442HXNS
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Pistons. 3.785 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273785-7
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Alternator Bracket, For SUM-G3977, Chrome, Steel, Chevy, Each
Part Number: SUM-G3979
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pan Drain Plug, Magnetic, 1/2-20 RH in. Threads, Seal, Each
Part Number: SUM-G15
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision Cam Bearings, Chevy LS first design 1997-03
Part Number: SUM-1000S00
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 4340 Rotating Assembly, 402 Cid., 4.000 bore, 4.000 stroke, 24X, 6.125 rod, 8cc dish, 11:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400008
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Rod Bearings, Direct Replacement, 0.030 in. Crankshaft Undersize, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171030
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-299S274000-2
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pan Drain Plug, Magnetic, Steel, Black Powdercoated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102B
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Piston, 4.000 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943400012
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro SBC CT3 Hydraulic Roller Cam 1, LS Firing Order, 244/258 Dur., 109 LSA, +4.5 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift 1.6, Roller Block
Part Number: SUM-8817SN
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, GM LS Gen III/IV, Chevy, Set of 16
Part Number: SUM-HT223-16
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pistons, Forged, Flat, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17365FC-30
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 4340 Piston and Rod Kit, 365 Cid., 4.005 bore, 3.622 stroke, 6.125 rod, 12cc Dish, 9.6:1 @ 65cc, 9.2:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L00512
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Cooler Bypass Block-Off Plate, Billet Aluminum, Clear Anodized, With Dual 90* 1/8 in. NPT Ports, Chevy, LS, Each
Part Number: SUM-121027
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, Standard Clearance, set
Part Number: SUM-1227HS
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .011 undersize (thicker), set
Part Number: SUM-663H011
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Valve Cover Grommets, Rubber, Chevy, GMC, Hummer, Pontiac, Chevy/GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-110570
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Ford 4.6, 5.0, 5.4L, Mod, Narrowed, Standard Clearance, set
Part Number: SUM-1442HNS
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS Rotating Assembly, 325 Cid., 3.780 bore, Standard 3.622 stroke, 24X, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R2436L7807
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons for 383 Stroker Chevy Long Rod, 4.040 bore, 1.125 C.H., 3.75 in. stroke, 6 in. rod, 9cc reverse dome 10.5@64cc, 10.1@67cc, 9.7@72cc
Part Number: SUM-SBC383040L
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, .001 Extra Clearance, set
Part Number: SUM-1227HXS
Not Yet Reviewed
Estimated Ship Date: Dec 10, 2025 if ordered today
Estimated Ship Date: Dec 10, 2025 if ordered today
Pro LS Piston and Rod Kit, 330 Cid., 3.810 bore, Standard 3.622 stroke, 6.098 rod, 2cc dome, 11:1 @ 61cc, 10.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR368102
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS Piston and Rod Kit, 330 Cid., 3.810 bore, Standard 3.622 stroke, 6.098 rod, 7cc dish, 9.8:1 @ 61cc, 9.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR368107
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Timing Cover, 2-Piece, Cast Aluminum, Polished, Without Cam Sensor, Chevy, LS, V8, Each
Part Number: SUM-G6322P
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.