Availability
Lifters, Mechanical Roller, Vertical Link Bar, 0.300 in. Taller, Chevy, Small Block, Set of 16
Part Number: CCA-8995-16
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston and Ring Kit, PowerPak, Forged, 4.030 in. Bore, Chevy, Small Block, Kit
Part Number: MLE-930200130
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Harmonic Balancer, External Balance, Steel, Black, Ford, Powerstroke Diesel, Each
Part Number: FLU-720221
Estimated Ship Date: Today
Estimated Ship Date: Today
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.535 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC65352H
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston and Ring Kit, FHR Forged, Flat, 4.310 in. Bore, Chevy, Big Block, Kit
Part Number: UEM-IC9920KTM060
Estimated Ship Date: Today
Estimated Ship Date: Today
ESP BBC 6.635" ROD
Part Number: ESP-66353D2000
Not Yet Reviewed
Estimated Ship Date: Dec 23, 2025 if ordered today
Estimated Ship Date: Dec 23, 2025 if ordered today
Camshaft, Hydraulic Roller Tappet, Advertised Duration 258/262, Lift .458/.458, Chevy, Small Block, Each
Part Number: CCA-08-409-8
Estimated Ship Date: Today
Estimated Ship Date: Today
Camshaft, Hydraulic Roller Tappet, Advertised Duration 269/276, Lift .495/.503, Chevy, Small Block, Each
Part Number: CCA-08-502-8
Estimated Ship Date: Today
Estimated Ship Date: Today
Pulley Kit, Serpentine, Aluminum, Clear Powdercoated, Chevy, Small Block, Electric Water Pump, Ultra Kit
Part Number: MCH-22016
Estimated Ship Date: Today
Estimated Ship Date: Today
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8716-1DT
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston and Ring Kit, Hypereutectic, Flat, 4.060 in. Bore, Mopar, Small Block, Kit
Part Number: UEM-KB107KTM-060
Not Yet Reviewed
Estimated Ship Date: Dec 29, 2025 if ordered today
Estimated Ship Date: Dec 29, 2025 if ordered today
Pistons, Forged, Dome, 4.280 in. Bore, Chevy, Set of 8
Part Number: UEM-IC9919-030
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston and Ring Kit, FHR Forged, Dome, 4.250 in. Bore, Chevy, Big Block, Kit
Part Number: UEM-IC9919KTMSTD
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, 4340 H-Beam, Cap Screw, Bushed, Chevy, Small Block, Set of 8
Part Number: MAN-14054-8
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
Connecting Rods,4340, I-Beam, 6.100 Length, ARP 8740 Hardware, LS, Set of 8
Part Number: SCA-26100944
Estimated Ship Date: Today
Estimated Ship Date: Today
Rocker Arm Kit, Includes 3/8 in. Studs, Nuts, 1.8 Ratio Full Roller Rockers, Guide Plates, Chevy, 5.7L, Kit
Part Number: CCA-16755-KIT
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston and Ring Kit, PowerPak Plus, Forged, Ford, Small Block, Windsor, Kit
Part Number: MLE-930245825
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2025 if ordered today
Estimated Ship Date: Dec 8, 2025 if ordered today
Pistons, Forged, Dome, Single Valve Relief, 4.280 in. Bore, 4.000 in. Stroke, 6.135 in. Rod, 1.645 in. Compression, Chevy, Set of 8
Part Number: JEP-212135
Not Yet Reviewed
Estimated Ship Date: Dec 9, 2025 if ordered today
Estimated Ship Date: Dec 9, 2025 if ordered today
Camshaft, Hydraulic Roller Tappet, Advertised Duration 292/300, Lift .584/.579, Chevy, Small Block, Each
Part Number: CCA-12-468-8
Not Yet Reviewed
Estimated Ship Date: Jan 12, 2026 if ordered today
Estimated Ship Date: Jan 12, 2026 if ordered today
Camshaft, Mechanical Roller Tappet, Advertised Duration 268/268, Lift .525/.525, Chevy, Small Block, Each
Part Number: CCA-12-700-8
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, Compstar, Forged, H-Beam, ARP Cap Screws, Bushed Pin, 5.700 in. Length, Chevy, Set of 8
Part Number: CPI-A5700CS2A2AH
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Camshaft, Hydraulic Roller Tappet, Advertised Duration 260/264, Lift .474/.474, Chevy, Small Block, Each
Part Number: CCA-08-411-8
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Rebuild, Hypereutectic Dish, 4.030 in. Bore, Standard Rod, Standard Main, Chevy, 350 Kit
Part Number: FEM-BK6087-300
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Forged Pro pistons for SB Chevy 350 Long Rod, 4.030 bore, 1.260 C.H., 3.48 in. stroke, 6 in. rod, 5cc flat top 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72.
Part Number: SUM-SBC350030L
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Valve Covers, Cast Aluminum, 409 Chevy Style for LS, 409 Decals, Breather Tube, 2.750 in Tall, Natural, Centerbolt, Gen 3/4, Chevy, Pair
Part Number: LSS-GMLS1004
Estimated Ship Date: Dec 2, 2025 if ordered today
Estimated Ship Date: Dec 2, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.