Availability
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, BBF 460 .001 Extra Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1039HXS
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Pro LS 2618 Forged Piston, 3.903 bore, 1.299 C.H., 7cc dish, Std. Stroke, 6.125 Full-floating Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-2999273903-7
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Main Bearings, Race Series Main Bearing Sets, 0.001 in. Crankshaft Undersize, Tri-metal Copper-lead Alloy, Ford, Small Block Windsor 302, Set of 5
Part Number: SUM-590HXS
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 4X, Single Row, 0.010 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6644-4X-010
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Oil Fill Cap, Screw-In, Billet Aluminum, Black Anodized, -16 AN, Chevrolet, V8, LS, Each
Part Number: SUM-440368B
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Rod Bearings, Direct Replacement, 0.020 in. Crankshaft Undersize, Bi Metal, Chevy, Big Block, Set of 8
Part Number: SUM-171220
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Main Bearing, BB FORD 429 460 .001 Undersize, Set
Part Number: SUM-1039H-01
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Rocker Arm, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Each
Part Number: SUM-G6930B-1
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, ARP 2000 PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC61352H
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Alternator Bracket, Steel, Chrome, Water Pump Mount, Long Water Pump, Chevy, Big Block, Each
Part Number: SUM-409638
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Pro SBC Stage 7 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 248/256 Dur., 108 LSA + 2 Adv, .518/.525 1.5 Ratio, .553/.560 1.6 Ratio, 3000-7000 Range
Part Number: SUM-1206
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC61358H
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Timing Cover Bolts, Stainless Steel, Polished, Hex Head, Chevy, Small Block, Kit
Part Number: SUM-G1574HS
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Cam and Lifter kit, Pro SBC Retrofit Stage 7 Hyd. Roller LS Firing Order, 252/258 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, 3200-7200 RPM Range
Part Number: SUM-K1227
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Main Bearings, Race Series Main Bearing Sets, Stock Crankshaft Size, Tri-metal Copper-lead Alloy, Chevrolet, Big Block, Set of 5
Part Number: SUM-829HS
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HDS
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Connecting Rods, Performance, H-beam Style, Forged 4340 Steel, 6.200 in. Length, 2.123 rod journal, .927 pin, Ford, 5.8L Windsor, Set of 8
Part Number: SUM-SBF620028H
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Valves, Intake, Stainless Steel, 2.050 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8
Part Number: SUM-V8004-8
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .010 undersize (thicker), set
Part Number: SUM-663HC010
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 351 Windsor Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1432HS
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Valve, Exhaust, Stainless Steel, 1.880 in. Diameter, .371 in. Stem, 5.350 in. Length, Chevy, Each
Part Number: SUM-V8030-1
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Timing Pointer, Billet Aluminum, Black Anodized, Chevy, 6.6 in. Balancer, Small Block, Each
Part Number: SUM-G6312-6
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBF 302 Windsor, Standard Clearance, set
Part Number: SUM-634HCS
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP L19 260K PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC638519H
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Alternator Pulley, Replacement, V-Belt, Steel, Black, for SUM-G3977B, Each
Part Number: SUM-G3948B
Not Yet Reviewed
Estimated Ship Date: Monday 11/24/2025
Estimated Ship Date: Monday 11/24/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.