Availability
1985 CHEVROLET Summit Racing Engines & Components
Oil Pan, Steel, Chrome Plated, 5 qt., Chevy, Small Block, 2-Piece Rear Main, Passenger Side Dipstick, Each
Part Number: SUM-G3501
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
PRO BBC H.R. 2 Hydraulic Roller Cam, 4/7 Swap, 212/218 Duration @ .050, 110 LSA + 5 Adv. , .595/.588 with 1.7 ratio, .630/.623 with 1.8, 2300-5800
Part Number: SUM-1252
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, Kit
Part Number: SES-3-60-08-024
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 304/316, Lift .540/.540, Chevy, Big Block, Kit
Part Number: SUM-K1303
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Combo, Summit SFI Flexplate 168-Tooth, OEM Balancer, Summit-ARP Bolts, Chevy, 265-350, 2-Piece Seal, Kit
Part Number: CMB-08-0002
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Crankshaft Pulley Shims, Spacers, Aluminum, Chevrolet, Chevy Small Block Gen I, Set of 3
Part Number: SUM-329715
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 302/302, Lift .500/.500, Chevy, Small Block, Kit
Part Number: SUM-K00112
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifter kit, Pro SBC Stage 6 Hyd. Flat-Tappet 4/7 Firing Order Swap, 242/248 Dur., 108 LSA + 2 Adv, .510/.518 1.5 Ratio, 2600-6600 Range
Part Number: SUM-K1205
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.135 in. Length, .990 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC61358H
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Oil Pump and Pickup Assembly, High-Volume, Chevy, Big Block, Kit
Part Number: SES-3-90-08-006
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
PRO BBC H.R. 9 Hydraulic Roller Cam, 4/7 Swap, 255/264 Duration @ .050, 112 LSA + 7.5 Adv. , .700/.700 with 1.7 ratio, .741/.741 with 1.8, 4000-6900
Part Number: SUM-1259
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Crankshaft Pulley, V-Belt, 3-Groove, 7.74 in., Steel, Chrome, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3958
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam Button Spacer, Steel, Roller, Chevy, Big Block, Each
Part Number: SUM-G004
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Chevy, V6/V8 Small Block, Set
Part Number: SUM-G6501
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Water Pump Pulley, V-Belt, 2-Groove, 5/8 Pilot, Steel, Chrome, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3951
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam Bearings, Direct Replacement, Steel Backed Babbitt, Chevy, Big Block, Kit
Part Number: SUM-173200
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
PRO BBC H.R. 1 Hydraulic Roller Cam, 4/7 Swap, 204/214 Duration @ .050, 110 LSA + 4 Adv. , .510/.510 with 1.7 ratio, .540/.540 with 1.8, Idle-5600
Part Number: SUM-1251
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Oil Pickup, Standard Volume, Press Fit, Street/Strip Pan Style, 8.250 in. Pan Depth, 0.625 in. Tube Dia., Chevy, V8, Ea.
Part Number: SUM-G3502P
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cylinder Head Bolts,Extreme Duty, 6-point, 8740 Chromoly, Black Oxide, 7/16-14 in. Thread, Premium Quality, Chevy, Small Block, Kit
Part Number: SUM-910200-PRO
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifters, Mechanical Flat Tappet, Advertised Duration 296/312, Lift .536/.527, Chevy, Small Block, Kit
Part Number: SUM-CT104K
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Pro SBC Stage 5 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 236/242 Dur., 108 LSA + 2 Adv, .495/.510 1.5 Ratio, .528/.544 1.6 Ratio, 2200-6400 Range
Part Number: SUM-1204
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Oil Pump and Pickup Assembly, High-Volume, Chevy, Big Block, Kit
Part Number: SES-3-90-08-004
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Pro SBC Stage 8 Hyd.Flat-Tappet 4/7 Firing Order Swap Cam, 252/258 Dur., 107 LSA + 1.5 Adv, .533/.540 1.5 Ratio, .569/.576 1.6 Ratio, 3200-7200 Range
Part Number: SUM-1207
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifter kit, Pro SBC Stage 2 Hyd. Flat-Tappet 4/7 Firing Order Swap, 212/218 Dur., 111 LSA + 2 Adv, .428/.450 1.5 Ratio, 1000-5550 Range
Part Number: SUM-K1201
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Engine Bolts, Stainless Steel, Natural, Hex Head, Chevy, Small Block, Kit
Part Number: SUM-56490HS
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster