Availability
Crate Engine, GM 350, Stage 2, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevrolet, 350 CID, Each
Part Number: HPE-HP291PM
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Engine Assembly, Stage 3 Crate Engine, Long Block, 1-Piece Main Seal, Chevy, Small Block, LS, 415, Each
Part Number: HPE-LS02C
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Engine Assembly, Stage 1 Crate Engine, Long Block, 2-Piece Main Seal, Chevy, Big Block, 540, Each
Part Number: HPE-HP42
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Engine Assembly, Stage 2 Crate Engine, Long Block, 2-Piece Main Seal, Chevy, Big Block, 540, Each
Part Number: HPE-HP42M
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Crate Engines, Ford 502 515 HP Stage 1 Long Block, 8.2L/502, Assembled, Internal Balance, Aluminum Cylinder Heads, Ford, Big Block 385 Series, Each
Part Number: HPE-HP102
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Estimated Ship Date: Today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.