Availability
Crate Engine, Chrysler 360 Magnum Complete Long Block, Remanufactured, Cast Iron Block and Cylinder Heads, 9.3:1 Compression, Dodge, Jeep, 5.9L, Each
Part Number: HPE-HP113C
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Crate Engine, GM 350 Small Block Stage 3, 290 HP, Long Block, External/Internal Engine Balance, Vortec Heads, Carburetor, Each
Part Number: HPE-HP99C
Estimated Ship Date: Today
Estimated Ship Date: Today
Crate Engine, Base Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, Chevy, 350, Each
Part Number: HPE-HP98
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Assembly, Stage 2 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32M
Estimated Ship Date: Today
Estimated Ship Date: Today
Crate Engine, Ford 427 C.I.D. 545 HP, Complete Engine, 4-bolt Mains, 10.4:1 Compression, Dart SHP Block, Aluminum Cylinder Heads, Ford, Windsor, Each
Part Number: HPE-HP112CBLK
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Crate Engine, GM 350, Stage 1, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP291P
Estimated Ship Date: Today
Estimated Ship Date: Today
Crate Engine, Performance, Complete Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, 4-Bolt Main, Internal/External Balance, Chevy, 350, Each
Part Number: HPE-HP98C
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Assembly, Stage 3 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32C
Estimated Ship Date: Today
Estimated Ship Date: Today
Crate Engine, GM 350, Stage 3, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevy, 350, Each
Part Number: HPE-HP291PC
Estimated Ship Date: Today
Estimated Ship Date: Today
Crate Engine, Mid Dress Long Block, Cast Iron Heads, Hydraulic Roller Camshaft, Chevy, 350, Each
Part Number: HPE-HP98M
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Crate Engine, GM 350, Stage 2, Long Block, Internal/External Engine Balance, Cast Iron Heads, Chevrolet, 350 CID, Each
Part Number: HPE-HP291PM
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster