Availability
Connecting Rods, Speedway Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.125 in. Long, Chevy, Small Block, Set of 8
Part Number: OLV-C6125STSW8
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolts, Pro Series, 2000 Alloy, Chevy, 7.0L, Set of 16
Part Number: ARP-234-6302
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, SIR 5140 Steel I-Beam, Bushed, Chevrolet, Small Block LS, Set of 8
Part Number: ESP-SIR6100NLW
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.000 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-6600021A
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolts, 12-Point, Cap Screw, 7/16 in. Thread, 1.600 in. Length, Chevy, H-Beam, Set of 4
Part Number: MAN-42249-4
Estimated Ship Date: Today
Estimated Ship Date: Today
Cap Screws, Connecting Rod, ARP 2000, 7/16 in., Set of 4
Part Number: MAN-42390-4
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod, H-Beam, 4340 Forged Steel, Cap Screw, Floating, 7.100 in. Length, Chevy, Chrysler, Set of 8
Part Number: ESP-7100C3D2000
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.200 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-26200716
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, 90 Degree V6, Set of 6
Part Number: ESP-570063D
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, ESP 4340 Steel H-Beam, Cap Screw, Bushed, Ford, Cleveland, Set of 8
Part Number: ESP-5780F3D
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolts, High Performance Wave-Loc, 8740 Chromoly Steel, Ford, 289, 302, Set of 16
Part Number: ARP-154-6402
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, SIR 5140 Steel, I-Beam, 5.956 in. Length, Press Fit, Ford, Small Block, Set of 8
Part Number: ESP-SIR5956FP
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, SIR 5140 I-Beam, Press Fit, Chevy, Big Block, Set of 8
Part Number: ESP-6135P
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.385 in. Long, Chevrolet, Big Block, Set of 8
Part Number: ESP-FSI6385
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC63852H
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, Pro Stock, I-Beam, Forged 4340 Steel, Press-Fit, 6.125 in. Long, Jeep, Set of 6
Part Number: SCA-2406125P
Estimated Ship Date: Today
Estimated Ship Date: Today
Rod Bolts, High Performance Series, 8740 Chromoly Steel, Pontiac V8, Set of 16
Part Number: ARP-190-6001
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.000 in. Long, Chevrolet, Small Block, LT, Set of 8
Part Number: ESP-FSI6000B
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.760 in. Length, Mopar V8, 440, 7.2L, Set of 8
Part Number: SCA-6676010
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolt, 8740 Chromoly Steel, 7/16 in.-20 Thread, 1.400 in. Length, Each
Part Number: SCA-4AP1400-1LU
Estimated Ship Date: Today
Estimated Ship Date: Today
H-beam rod
Part Number: ESP-71003D
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolt, Replacement, ARP2000 Alloy, 7/16-20 in. Thread Size, 1.450 in. Underhead Length, Each
Part Number: SCA-4AP1450-2LU
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolts, High Performance Series, 8740 Chromoly Steel, AMC, 258, 6-Cylinder, Set of 12
Part Number: ARP-112-6001
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, Big Block, Set of 8
Part Number: ESP-68003D
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rod Bolts, Pro Series, 8740 Chromoly Steel, Manley Rods, Chevy, 350/454, V8, Pair
Part Number: ARP-200-6026
Estimated Ship Date: Today
Estimated Ship Date: Today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.