Availability
Connecting Rod Kit, Powersports, Forged Steel, Connecting Rod, Bearings, Thrust Washer, Kit
Part Number: HRI-8147
Not Yet Reviewed
Estimated Ship Date: Jul 24, 2025 if ordered today
Estimated Ship Date: Jul 24, 2025 if ordered today
CONN ROD BOLT
Part Number: PIO-CRB-177-100
Not Yet Reviewed
Estimated Ship Date: Jul 31, 2025 if ordered today
Estimated Ship Date: Jul 31, 2025 if ordered today
Connecting Rod Bolts, OE Replacement, 3/8-24 in. Chevy, Small Block, Set of 100
Part Number: PIO-CRB-388-100
Estimated Ship Date: Jul 31, 2025 if ordered today
Estimated Ship Date: Jul 31, 2025 if ordered today
CONN ROD BOLT
Part Number: PIO-CRB-427-100
Not Yet Reviewed
Estimated Ship Date: Jul 31, 2025 if ordered today
Estimated Ship Date: Jul 31, 2025 if ordered today
CONN ROD BOLT
Part Number: PIO-CRB-549-16
Not Yet Reviewed
Estimated Ship Date: Jul 31, 2025 if ordered today
Estimated Ship Date: Jul 31, 2025 if ordered today
CONN ROD BOLTS
Part Number: PIO-S-1037
Not Yet Reviewed
Estimated Ship Date: Jul 31, 2025 if ordered today
Estimated Ship Date: Jul 31, 2025 if ordered today
Connecting Rod, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, Big Block, Each
Part Number: ESP-63853DL19-1
Not Yet Reviewed
Estimated Ship Date: Aug 13, 2025 if ordered today
Estimated Ship Date: Aug 13, 2025 if ordered today
4340 H-BEAM ROD NISSAN VQ35 H-BEAM
Part Number: ESP-CRS5680N3D-1
Not Yet Reviewed
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
Connecting Rod, ARC Stroker, I-beam, T-651 Billet Aluminum, Polished, 4.425 in, Jr Dragster Engines Only, Each
Part Number: JRC-685-6216
Not Yet Reviewed
Estimated Ship Date: Aug 4, 2025 if ordered today
Estimated Ship Date: Aug 4, 2025 if ordered today
Main Bearings, XP-Series, Coated, Standard Size, Tri-Metal Copper-Lead Alloy, Chevrolet, Small Block, Set of 8
Part Number: KGB-CR8028XPC
Not Yet Reviewed
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.