Availability
Timing Chain, C5R LS, Single Roller, Seamed Roller Design, Steel, Chevy, Each
Part Number: HMI-C5-RCHAIN
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Pushrods, 5/16 in. Diameter, 8.200 in. Long, 4130 Chromoly, 0.080 in. Wall, For Guideplates, Set of 16
Part Number: TFS-21408200
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Summit HDR Pushrods, Chevy BBC, 3/8 in., 8.280 Intake Length, 9.250 in. Exhaust Length, .135 wall Premium One-Piece, Heat-Treated, Set of 16
Part Number: SUM-149382809250
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Camshaft Kits, Stock Replacement, Hydraulic Roller Tappet, Chevy, Small Block, Kit
Part Number: MEL-CL-MC1320
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Summit HDR Pushrods Small Block Chevy 5/16 7.900 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends Heat-Treated, Set of 16
Part Number: SUM-14957900
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Camshaft, Hydraulic Flat Tappet, Advertised Duration 270/270, Lift .470/.470, Chevy, Small Block, Each
Part Number: CCA-12-211-2
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Timing Set, Single Roller Chain, Billet Steel Sprockets, 9 Key Way Version, Chevy, 6.0L LS2, Kit
Part Number: CLO-9-3672TX9
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Lifters, Mechanical Roller, Vertical Link Bar, Chevy, Set of 16
Part Number: CRO-66290-16
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Valves, Exhaust, Stainless Steel, 1.500 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Set of 8
Part Number: SUM-V8008-8
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 256/268, Lift .447/.454, Chevy, Small Block, Kit
Part Number: CCA-CL12-234-2
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Valve Springs, Dual, 1.550 in. Outside Diameter, 508 lbs./in. Rate, 1.080 in. Coil Bind Height, Set of 16
Part Number: HRS-98643
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8712R1
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Rocker Arm Stud Girdle, Aluminum, Red, 7/16 in.-20 Thread, Chevy, Big Block, Kit
Part Number: CCA-4021
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Pushrod, Chromoly, 5/16 in. Diameter, 7.800 in. Length, Ball Ends, Each
Part Number: MEL-501004
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Lifters, Hydraulic Flat Tappet, Oldsmobile, Pontiac, Set of 16
Part Number: CCA-852-16
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Rocker Arms, Pedestal Mount, Full Roller, Aluminum, 1.6 Ratio, 5/16 in. Stud, Jeep, 4.0L, Set of 12
Part Number: CSP-S40196
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Camshaft, Retrofit, Hydraulic Roller Tappet, Advertised Duration 282/286, Lift .600/.593, Ford, 429, 460, Each
Part Number: HRS-243745-10
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Timing Chain and Gear Set, Ultimate Adjustable, Double Roller, Billet Steel Sprockets, Chevy, Big Block, Set
Part Number: CCA-8110
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Camshaft Retainer Plates, BTR Cam Retainer Plate, Gen III/Gen IV LS Engines
Part Number: BTC-BTR89016
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Valve Springs, 1200 Series, Beehive, Single, 1.445 in. O.D., 370 lbs/in. Rate, 1.210 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1220X-16
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Dampener, Timing Chain, Plastic, Black, Chevy, Pontiac, 6.0L, Each
Part Number: ADO-12588670
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 210/218 Dur.@ .050 112 LSA +1 Adv. Lift .500/.500, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8712-1
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Cam and Lifters, Hydraulic Flat Tappet, Adv. Duration 284/290, Lift .480/.495, Lobe Sep. 110, Small Chevy, Kit
Part Number: TFS-K31401001
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Rocker Arms, Sportsman Steel Roller Tip, Stud Mount, Chromoly Steel, Natural, 1.52 Ratio, Fits 7/16 in. Stud, Pontiac, Pontiac V8, Set of 16
Part Number: PQX-0845501
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Timing Chain, Link Belt Style, Billet Steel Crank Sprocket, Ford, Lincoln, 5.4L Modular, Set
Part Number: CLO-9-0391SB
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.