Availability
SB Mopar 340 Forged Steel Crank, 4.000 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.
Part Number: SUM-MOP3404000
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Lifters, Mechanical Roller, Vertical Link Bar, Chevy, Set of 16
Part Number: CCA-871-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, S/R Torquer, Cast Iron, Assembled, 76cc Chamber, 170cc Intake, Chevy, 302, 327, 350, 400, Each
Part Number: WRL-042670-1
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Crankshaft, Internal Balance, Forged 4340 Steel, 3.48 in. Stroke, Chevrolet, Small Block, Each
Part Number: MAN-190310
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
INDIVIDUAL MAIN BEARINGS
Part Number: CLE-MB4119VU24
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Valve Covers, Tall, Perimeter Bolt, Cast Aluminum, Black Powdercoat, 427 Chevrolet Logo, Chevy, Big Block, Pair
Part Number: NAL-19202589
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Race-Rite Oval, Aluminum, Bare, 119cc Chamber, 270cc Intake Runner, Chevy, Big Block, Each
Part Number: BRO-2060000
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft Kits, Gen V LT1 LT4 LT5 Gen 5 DOD Delete No Cam
Part Number: CMB-09-0049
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 282/288, Lift .589/.600, Chevy, Big Block, Kit
Part Number: HRS-CL120325-10
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Connecting Rod, H-Beam, 4340 Forged Steel, Cap Screw, Floating, 7.100 in. Length, Chevy, Chrysler, Set of 8
Part Number: ESP-7100C3D2000
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, DHC™ 200, CNC Street Ported, Bare, No Accessory Bolt Holes, Small Chevy, Each
Part Number: TFS-3021B002-C00
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Lifters, Mechanical Roller, Vertical Link Bar, Chevy, Set of 16
Part Number: CCA-873-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Piston and Ring Kit, Forged, 4.090 in. Bore, Chrysler, Dodge, Jeep, Ram, Kit
Part Number: MLE-930279090
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.100 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-66100945
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 269/276, Lift .495/.503, Chevy, Small Block, Kit
Part Number: CCA-CL08-502-8
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Timing Chain Kit, Link Belt, 1-bolt, Steel Cam Gear, Steel Crank Gear, Guide, Tensioner, Buick, Cadillac, Chevrolet, GMC, Pontiac, Saab, Saturn, Kit
Part Number: DAC-KTC1391
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshafts, Hydraulic Roller Follower, Advertised Duration 261/282, Lift .450/.450, Ford, Modular V8, 3V, Pair
Part Number: CCA-127205
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rocker Arms, Shaft Mount, Steel, 1.7 Ratio, Chevy, LS, Kit
Part Number: CCA-1982-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Crankshaft, 1-Piece Seal, Internal Balance, Forged 4340 Steel, 4.125 in. Stroke, Chevy, Each
Part Number: ESP-434641256100
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Lifters, Mechanical Roller, Inboard Vertical Link Bar, Chrysler, Set of 16
Part Number: CCA-8043-16
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pistons, Flat Top, Competition Series, Forged Aluminum, 4.065 in. Bore, -2.00cc Head Volume, Chevy, LS, Set of 8
Part Number: DPP-11543-R1-8
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Connecting Rods, Forged 4340, H-Beam, 12-Point, Cap Screw Bolts, 6.125 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-6612521
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Lifter, Sportsman, Mechanical Roller, 0.875 in. O.D., Ford, Big Block, Needle Bearing Axle, Set of 16
Part Number: CCA-96836-16
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Gear Drive, Single Idler, Flat Cover Style, Mopar, Big Block B/RB/Hemi, Set
Part Number: MIL-13000
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.