Availability
Pistons, Forged, 4.040 in. Bore, Ford, Set of 8
Part Number: TFS-51404330-40
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Mechanical Roller Tappet, Advertised Duration 274/280, Lift .639/.646, Chevy, Big Block, Each
Part Number: CCA-11-770-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Cover, Tall, Aluminum, Polished, Finned, Offenhauser Logo, Ford, L6, Each
Part Number: OFY-6280-HR
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pump, High-Volume, high-Pressure, Wet Sump, Pickup Included, Chevy, Small Block, Kit
Part Number: MOR-22192
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 269/276, Lift .495/.503, Chevy, Small Block, Each
Part Number: CCA-08-502-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 276/282, Lift .510/.510, Chevy, Big Block, Each
Part Number: CCA-11-423-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Thumpr NSR, Hydraulic Roller, 276/295 Advertised Duration, 0.541/0.536 Lift, GM LS, Each
Part Number: CCA-54-701-11
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8716-1
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arm, Ultra Gold, Full Roller, 1.5 Ratio, Aluminum, Narrow Body, Self-Aligning, 3/8 in. Stud, Chevy, Set of 16
Part Number: CCA-19015-16
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
CYL HEAD
Part Number: VRE-2DHA2R
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
Oil Pump, High-Volume, High-Pressure, Ford, Lincoln, Mercury, Each
Part Number: MEL-10176HV
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Stage 5.5 Pro LS Twin-Turbo Cam. 251/255 Dur., 117 + 6, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-K8726R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Piston and Ring Kits, PowerPak, 4.280 in. Bore, 4.020 in. Stroke, Dome, with Single Valve Relief, Forged Aluminum, Chevy, Big Block, Kit
Part Number: MLE-928914180
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, 3-Bolt, Hydraulic Roller, Advertised Duration 280/288, Lift .541/.537, Mopar, Big Block B/RB, Each
Part Number: CCA-23-711-9
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pistons, FHR Coated, Forged 4032 Aluminum, Flat Top with Two Reliefs, 3.898 in. Bore, 0.945 in. Wrist Pin, GM, LS, 5.7L, Set
Part Number: UEM-IC9988C-STD
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 283/303, Lift .547/.530, Chevy, Big Block, Each
Part Number: CCA-11-600-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/280, Lift .525/.525, Chevy, 90 Degree V6, Each
Part Number: CCA-09-430-8
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/288, Lift .576/.570, Chevy, Small Block, Each
Part Number: CCA-08-467-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, NSR Drift, Hydraulic Roller Tappet, 3,000-7,500 RPM Range, 3-Bolt Gear Attachment, Chevy, Small Block
Part Number: CCA-54-777-11
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, 7/16 in. Stud, Chevy, Big Block, Set of 16
Part Number: SCC-SCP3014
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Springs, Triple, 1.645 in. Outside Diameter, 681 lbs./in. Rate, 1.130 in. Coil Bind Height, Set of 16
Part Number: CCA-947-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS 2618 Forged Piston, 4.080 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-326943408012
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 6.000 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-6600021
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 259/265, Lift .515/.522, Chevy, Small Block, LS
Part Number: CCA-54-408-11
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 268/276, Lift .570/.565, Chevy, Small Block, Each
Part Number: CCA-12-466-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.