Availability
Connecting Rods,4340, I-Beam, 6.100 Length, ARP 8740 Hardware, LS, Set of 8
Part Number: SCA-26100944
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Crankshaft, 2-piece Seal, Internal Balance, Forged 4340 Steel, 3.875 in. Stroke, 2.100 in. Pin, Chevy, 400
Part Number: CPI-SAM213-CS
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Pulley Kit, Serpentine, Aluminum, Clear Powdercoated, Pontiac, V8, Kit
Part Number: MCH-13105
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Dual Keyway, Black Anodized, SFI 18.1, Ford, 5.0L Modular
Part Number: ATI-918048
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Crankshaft, Internal Balance, Forged 4140 Steel, 3.75 in. Stroke, Chevrolet, Small Block, Each
Part Number: ESP-535337505700
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Pro LS 2618 Forged Pistons. 3.820 bore, 1.299 C.H., 2cc dome, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273820-2
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Oil Pan, Aluminum, Natural, 7.5 qt, 5.0L Coyote, Swap. Ford, Fox Body, Each
Part Number: MOR-20577
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 270/284, Lift .500/.500, Ford, 4.0L V6, Each
Part Number: CCA-49-422-8
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Oil Pan, BBC Gen V/VI, Drag Race, Steel, Black
Part Number: MOR-21050
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/280, Lift .566/.566, Chevy, Big Block, Each
Part Number: CCA-11-430-8
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, HRT Stage 1, Hydraulic Roller Tappet, RPM Range 1,800-6,800, Advertised Duration 271/279, Dodge, Each
Part Number: CCA-201-302-17
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 299/319, Lift .570/.554, Chevy, Big Block, Each
Part Number: CCA-11-602-8
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
SUM-8727 Pro LS Truck Torkinator Level 1 Cam Kit, Dual Springs, Seals, 200/205 Dur., 113 +4, .550/.550 Lift, 3-Bolt, 4.8, 5.3, 6.0 , 6.2 Vortec Truck
Part Number: SUM-8727-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Spring, 1300 Series, Dual, 1.500 in. Outside Diameter, 780 lb/in., 0.726 in Inside Diameter, Set of 16
Part Number: RSC-PAC-1355-16
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Big Block, Kit
Part Number: SUM-PANKIT16
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, CRS 4340 H-Beam, 6.243 in. Length, 0.927 in. Pin Diameter, Cap Screw, Bushed, Dodge, Chrysler, Ram, Hemi Gen III, Set of 8
Part Number: ESP-CRS6243H3D
Not Yet Reviewed
Estimated Ship Date: Sep 24, 2025 if ordered today
Estimated Ship Date: Sep 24, 2025 if ordered today
Camshaft Package, Hydraulic Flat Tappet, with Lifters, Locks, Springs, Timing, Advertised Duration 256/268, Lift 0.447 in./0.455 in., Pontiac V8, Kit
Part Number: CCA-K51-221-4
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 264/269, Lift .488/.495, Chevy, Small Block, Each
Part Number: CCA-08-501-8
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, ESP 4340 Steel H-Beam, Cap Screw, Bushed, Ford, Cleveland, Set of 8
Part Number: ESP-5780F3D
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, Hydraulic Roller, Advertised Duration 266/272, Lift .530/.530, Lobe Sep. 113, GM 5.7L LT1, Each
Part Number: TFS-31402081
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC63852H
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Covers, LS Ford Style, Cast Aluminum, Center Bolt, Plain, Cast Aluminum, Polished Finish, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-186
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Oil Pan, Steel, Black Powdercoated, 7 qt., Ford, 429/460, Each
Part Number: MOR-20625
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, Stage 2 LST, Hydraulic Roller Tappet, Advertised Duration 292/297, Lift .632/.627, Chevy, Small Block, Each
Part Number: CCA-54-303-11
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Covers, Aluminum LS, Center and Perimeter Bolt, Tall, Finned, Cast Aluminum, Polished Finish, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-181
Estimated Ship Date: Sep 11, 2025 if ordered today
Estimated Ship Date: Sep 11, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Estimated Ship Date: Monday 8/25/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.