Availability
Valve Springs, 1300 Series Circle Track, Dual, 1.550 in. O.D., 644 lbs./in. Rate, 1.150 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1325-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Mechanical Roller Tappet, Advertised Duration 289/299, Lift .600/.600, Chevy, Small Block, Each
Part Number: HRS-111133-10S
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Pro Touring, Steel, Gold Iridite, 7 qt., Mopar, Big Block, B/RB/Hemi, Fits A, B and E Bodies, Comp Baffling, Each
Part Number: MIL-31581
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam/Lifter, Valvetrain, Hydraulic Flat Tappet, Advertised Duration 262/270, Lift .493/.500, Ford 221-302, Kit
Part Number: CCA-K31-238-3
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Lifters, Mechanical Roller, Vertical Link Bar, Chevy, Set of 16
Part Number: CRO-66291-16
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 280/280, Lift .566/.566, Chevy, Big Block, Each
Part Number: CCA-11-430-8
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
SUM-8723 Level 1 Cam kit, Dual Springs, St. Ret., Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0
Part Number: SUM-8723-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 270/276, Lift .513/.513, Ford, 351W, Each
Part Number: CCA-35-421-8
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Street/Strip, Wet Sump, Stroker Clearanced, 4.250 in. Max Stroke, 7 Qt. Capacity, Steel, Black Powdercoated, Chevy, Small Block, Each
Part Number: MOR-20139
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshafts, Hydraulic Roller Follower, Advertised Duration 262/270, Lift .500/.500, Ford, Modular V8, 2V, Pair
Part Number: CCA-102100
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Filters, See Through, 4 in. Filter, -12 AN O-Ring Fittings, 60 Micron, Billet Aluminum, Black Anodized, Kit
Part Number: BCN-410-60-B
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS 2618 Forged Piston, 3.810 bore, 1.110 C.H., 12cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous,Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-110927381012
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS 2618 Forged Pistons. 3.785 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273785-7
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 264/274, Lift .512/.512, Mopar, Small Block, Each
Part Number: CCA-20-604-9
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pistons, Forged, Dome with Two Valve Reliefs, 4.030 in. Bore, Chevy, Small Block, Set of 8
Part Number: SLP-L2166AF30
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Hydraulic Roller Tappet, Godzilla Stage 1, Advertised Duration 275/288, Lift .598/.605, Ford, Each
Part Number: CCA-405-201-17
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rod, H-Beam, 5.090 in., Forged 4340 Steel, Floating Pin Style, 0.912 in. Pin End, 2.123 in. Rod Journal, Set of 8
Part Number: ESP-CRS5090F3D
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, Mechanical Roller Tappet, Advertised Duration 321/336, Lift .748/.748, Chevy, Big Block, Each
Part Number: CCA-11-747-14
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rods, Compstar, Forged 4340 Steel, H-Beam, 6.135 in. Length, Cap Screw, Chevy, Big Block, Set of 8
Part Number: CPI-B6135ES3B9AH
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Springs, 1300 Series Drag Race, Standard Style, Dual, 1.500 in. O.D., 780 lbs./in. Spring Rate, 1.130 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1330-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam/Lifter, Valvetrain, Hydraulic Flat Tappet, Adv Duration 260/260, Lift .489/.489, Chevy, 194, 230, 250, Kit
Part Number: CCA-K61-233-4
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, Supercharged Series, Internal Balance, Aluminum/Steel, 6 percent Overdriven, Chevy, 6.2L LS3
Part Number: ATI-918625
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pulley Kit, Chevy LS Fluid Damper Kit, Aluminum, Black/Silver Anodized, Chevy, for March LS Pro-Track Kits, Kit
Part Number: MCH-P800
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Gold Iridite, 6 qt., Chevy, Big Block, Mark V, Mark VI, Each
Part Number: MIL-30956
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pump, Wet Sump Style, Standard-Volume, Standard-Pressure, Billet Aluminum, 9 in. Pan Depth, Chevy, Big Block, Each
Part Number: MEL-10077-900SS
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.