Availability
Engine Timing Chain Kit, Timing Chain Kit
Part Number: CLO-9-4201SB1K3
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Lifters, Hydraulic Roller, Retrofit, Chevrolet, Big Block, Set of 16
Part Number: HPC-125-7401
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Pan, Street/Strip, Marine, Agriculture, Wet Sump, Steel, Clear Zinc, 10 qt., Chevy, Big Block, Each
Part Number: CHP-CP216LT
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cam/Lifter, Valvetrain, Hydraulic Flat Tappet, Advertised Duration 262/270, Lift .493/.500, Ford 221-302, Kit
Part Number: CCA-K31-238-3
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cam/Lifter, Valvetrain, Hydraulic Flat Tappet, Advertised Duration 276/283, Lift .468/.462, Chevy, Small Block
Part Number: CCA-K12-671-4
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head, Performer RPM, Aluminum, Bare, 72cc Chamber, 170cc Intake Runner, Ford, Big Block FE, Each
Part Number: EDL-60059
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Filters, Screw-On See Through, 4 in. Filter, -12 AN O-Ring Fittings, Billet Aluminum, Clear Anodized, Kit
Part Number: BCN-400-115
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Rollin' Thunder Hydraulic Roller, Advertised Duration 229/236, Lift .618 / .647, Ford FE, Each
Part Number: EDL-2220
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, GM LS Gen III/IV, Chevy, Set of 16
Part Number: SUM-HT223-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Harmonic Balancer, External Balance, Steel, Black, Chevy/GMC/Hummer, Diesel V8, Each
Part Number: FLU-800141
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pistons, Forged Aluminum, Flat, 4.020 in. Bore, 1.115 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17406C-20
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Harmonic Balancer, Steel, Black Chromate Finish, SFI 18.1, Ford, Each
Part Number: FLU-750201
Not Yet Reviewed
Estimated Ship Date: Oct 3, 2025 if ordered today
Estimated Ship Date: Oct 3, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Lower Engine Rebuild Kit, Flat Top Pistons, Moly, Standard Rod and Main, Cam Bearings, Chevy, GMC, 5.3L, Kit
Part Number: FEM-BK6080-000
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rod, H-Beam, 4340 Forged Steel, Cap Screw, Floating, 7.100 in. Length, Chevy, Chrysler, Set of 8
Part Number: ESP-7100C3D2000
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Pan, Engine Swap, Aluminum, Black Ceramic Coated, 4.250 in. Stroke, 5.5 Quarts, Chevy, 4.8, 5.3, 6.0L, Each
Part Number: HLY-302-1BK
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 288/294, Lift .520/.540, Chevy, Small Block, Each
Part Number: CCA-12-433-8
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Connecting Rods, Forged 4340, H-Beam, 12-Point, Cap Screw Bolts, 6.125 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-6612521
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pulley Kit, Serpentine, Aluminum, Clear Powdercoated, Ford, Big Block, 385 Series, Kit
Part Number: MCH-30245
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Harmonic Balancer, External Balance, Steel, Black, Chevrolet/GMC, Diesel V8, Duramax LGH/LML, Each
Part Number: FLU-830121
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 283/303, Lift .513/.498, Chevy, 5.0, 5.7L, Kit
Part Number: CCA-CL08-600-8
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 286/294, Lift .544/.541, Mopar, Small Block LA, Each
Part Number: CCA-20-813-9
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Camshaft, 3-Bolt, Hydraulic Roller, Advertised Duration 274/282, Lift .538/.534, Mopar, Big Block B/RB, Each
Part Number: CCA-23-710-9
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Valve Springs, Ultimate RPM Springs, Dual, 0.650 in. Max Lift, Powdered Metal Guides, Titanium Retainers, Steel 7 degree Locks, Valve Stem Seals, Kit
Part Number: BTC-SK703-0560BB
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Lifters, Hydraulic Roller, Link Bar, 0.903 in. Outside Diameter, 2.685 in. Seat Height, Dodge, Plymouth, Chrysler, Set of 16
Part Number: SUM-HT225-16
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943403012
Estimated Ship Date: Nov 3, 2025 if ordered today
Estimated Ship Date: Nov 3, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.