Availability
Oil Pump and Pickup Assembly, Standard-Volume, Pontiac, Kit
Part Number: SES-8-60-08-015
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Piston Rings, Plasma-Moly, 4.165 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553440
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .010 undersize (thicker) 1/2 Upper groove, set
Part Number: SUM-2221H25
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Valve Covers, Tall, Engine Dress Up, Breather, Timing Cover, Black Powdercoated, Chevy, Small Block, Kit
Part Number: SUM-7001SBT
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Alternator Bracket, Aluminum, Natural, Water Pump Mount, Dodge, 440, Kit
Part Number: SME-2007
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Alternator Bracket, Aluminum, Satin, Cylinder Head Mount, Long Water Pump, Chevy, Big Block, Kit
Part Number: SME-2025
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .010 undersize (thicker), Half-Upper groove, set
Part Number: SUM-909H010
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Cover, 2-Piece, Cast Aluminum, Polished, Without Cam Sensor, Chevy, LS, V8, Each
Part Number: SUM-G6322P
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Pontiac, V8, Set
Part Number: SUM-G6612R-B
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit HDR Pushrods Big Block Chevy 3/8 9.250 Length, Premium One-Piece .135 Wall 4130 Seamless Chromoly, 210 degree ends, Heat-Treated, Set of 8
Part Number: SUM-14939250
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Engine Accessory Brackets, Serpentine, Alternator Bracket, Power Steering Bracket, Idler Bracket, Billet Aluminum, Silver Anodized, LS, Kit
Part Number: SUM-340820-S
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 351 Windsor Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1432HS
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Cylinder Head Bolts,Extreme Duty, 6-point, 8740 Chromoly, Black Oxide, 7/16-14 in. Thread, Premium Quality, Chevy, Small Block, Kit
Part Number: SUM-910200-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Main Bearings, Race Series Main Bearing Sets, Stock Crankshaft Size, Tri-metal Copper-lead Alloy, Ford, Small Block Windsor 302, Set of 5
Part Number: SUM-590HS
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Timing Gear, Adjustable, Billet Steel, 3-Bolt, 4X, Single Row, 0.010 in. Line Hone, Chevy LS, Each
Part Number: SUM-G6644-4X-010
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 Extra Clearance for .010 undersize, Half-Upper groove, set
Part Number: SUM-909H009
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Oil Pump, Nodular Iron, Standard-Volume, Standard Pressure, Chevy, Anti-Cavitation, Small Block, Each
Part Number: SUM-121155SVN
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Piston Rings, Plasma-Moly, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553140
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.794 in. Length, Universal, Set of 16
Part Number: SUM-G6430
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 400 .001 Extra Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1038HXS
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Power Steering Pulley, V-Belt, 1-Groove, Billet Aluminum, Clear Powdercoated, 0.688 in. Bore, 5.500 Diameter, Ford, Each
Part Number: SUM-340501
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
LOW MOUNT ALT BRACKET SBC/BBC
Part Number: SUM-342000
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi Standard Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HS
Not Yet Reviewed
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Engine Dipstick, Braided Stainless Steel, Tumble Polished, Chevy, Small Block, Each
Part Number: SUM-122202
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 Extra Clearance for .010 undersize, set
Part Number: SUM-663H009
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.