Availability
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 272/272, Lift .454/.454, Chrysler, Small Block
Part Number: SUM-K50052
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 303/313, Lift .487/.508, Chevy, Small Block, Kit
Part Number: SUM-K1107
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 289/300, Lift .473/.497, AMC, 290-401, Kit
Part Number: SUM-K8600
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 285/285, Lift .480/.480, Mopar, Small Block, Kit
Part Number: SUM-K50062
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order Cam, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 3000-7000 RPM Range
Part Number: SUM-1226
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Big Block, Kit
Part Number: SUM-PANKIT10
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 284/284, Lift .480/.480, Chevy, Small Block, Kit
Part Number: SUM-K00072
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Pan, Steel, Spin-On Filter, Black Powdercoated, 7 Qt. Capacity, Chevy, LS, Each
Part Number: SUM-G3612B
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Combo, Oil Pan, Black Zinc, Pickup, High-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Small Block, Kit
Part Number: SUM-PANKIT8
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Vacuum Pump, Chrome, 23 in/hg Maximum Vacuum, 12 V DC, Internal Vacuum Control, 7.75 in. Height, 6.5 in. Length, 6 in. Width, Each
Part Number: SUM-760140-C
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
SUM-8728 Pro LS Big Truck Torkinator Level 1 Cam Kit, Beehive Springs, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/303, Lift .466/.488, Chrysler, Big Block, Kit
Part Number: SUM-K6401
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Connecting Rods, 4340, I-Beam, Thru-Bolt, 5.700 in. Length, 475 HP, Chevy, Small Block, Set of 8
Part Number: SUM-180370P
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pistons, Forged Aluminum, Flat, 3.800 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17401C-20
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Stage 4 Pro LS Turbo Cam. 238/234 117+5, .625/.600 Lift, 2 deg. Overlap, Maximum Power for larger 364+ CID. 6.0, 6.2, 7.0L, LS2 LS3 LS7 LQ4 LQ9
Part Number: SUM-8717R1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
PRO BBC H.R. 1 Hydraulic Roller Cam, 4/7 Swap, 204/214 Duration @ .050, 110 LSA + 4 Adv. , .510/.510 with 1.7 ratio, .540/.540 with 1.8, Idle-5600
Part Number: SUM-1251
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 284/284, Lift .519/.519, Chevy, Big Block, Kit
Part Number: SUM-K03052
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Summit Factory Performance Stage 1 LS Circle Track Cam, 225/236 110+1, .525/.525 Lift, Vortec LS1 LS2 LS6 LS3 LQ4, Summit's version of the ASA Cam
Part Number: SUM-8700
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Oil Pan, Steel, Spin-On Filter, Zinc Iridited, 7 Qt. Capacity, Chevy, LS, Kit
Part Number: SUM-G3612-K
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Covers, Stock Height, Cast Aluminum, Pontiac Logo, Polished, Pontiac, V8, Pair
Part Number: SUM-440416
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/282, Lift .545/.545, Chevy, LS, Each
Part Number: SUM-8714-1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
PRO BBC H.R. 6 Hydraulic Roller Cam, 4/7 Swap, 242/252 Duration @ .050, 113 LSA + 10 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3700-6600
Part Number: SUM-1256
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 309/309, Lift .514/.514, Chevy, Big Block, Kit
Part Number: SUM-K03072
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 270/278, Lift .398/.421, Chevy, Small Block, Kit
Part Number: SUM-K1101
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.