Availability
Crate Engine, Remanufactured, Long Block, Assembled, Chrysler, Dodge, Plymouth, 3.3L/201, Each
Part Number: VRE-DD78
Not Yet Reviewed
Estimated Ship Date: Oct 1, 2025 if ordered today
Estimated Ship Date: Oct 1, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Buick, Cadillac, Chevrolet, GMC, Saturn, 3.6L/217, Each
Part Number: VRE-DCVX
Not Yet Reviewed
Estimated Ship Date: Oct 1, 2025 if ordered today
Estimated Ship Date: Oct 1, 2025 if ordered today
HD IN-FRAME KIT
Part Number: CLE-4565031STD
Not Yet Reviewed
Estimated Ship Date: Oct 2, 2025 if ordered today
Estimated Ship Date: Oct 2, 2025 if ordered today
Engine Assembly, Stage 1 Crate Engine, Long Block, 1-Piece Main Seal, Chevy, Small Block, 383, Each
Part Number: HPE-HP33
Not Yet Reviewed
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Ford, 5.8L/351, Each
Part Number: VRE-DFA1
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Chevrolet, GMC, 3.5L/211, Each
Part Number: VRE-DCTY
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Nissan, 3.5L/3498cc, Each
Part Number: VRE-344G
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Chrysler, Dodge, Jeep, 3.6L/220, Each
Part Number: VRE-DDHA2
Not Yet Reviewed
Estimated Ship Date: Sep 29, 2025 if ordered today
Estimated Ship Date: Sep 29, 2025 if ordered today
Crankshaft, Compstar, Sport Series, Billet 4340 Steel, 3.413 in. / 86.7 mm Stroke, Ford, EcoBoost, 1.6L, Each
Part Number: CPI-S24002
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
COMPSTAR FORD 3.5 ECOBOOST 91.44mm STROKE
Part Number: CPI-S24007
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Crankshaft, Compstar, Sport Series, Billet 4340 Steel, 3.268 in. / 83 mm Stroke, Internal Balance, Nissan, VG30DETT, Each
Part Number: CPI-S25002
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Crankshaft, Compstar, Sport Series, Billet 4340 Steel, 3.059 in. / 77.7 mm Stroke, Internal Balance, Nissan, RB26DETT, Each
Part Number: CPI-S25004
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
MAGNUM 8CTWT LS CRANK 4.000 2.5585 2.1000
Part Number: CPI-5TO-31V-MG
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
CALLIES LS1 ULTRA DIRT BILLET CRANK 3.838 / 2.559 / 2.100
Part Number: CPI-AP3D31-UD
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
GM BB CHEVY CRANKSHAFT 4.375 2.750 2.200
Part Number: CPI-IBB-42B-GM
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Connecting Rod, Ultra Assassin, Forged 4340 Steel, I-Beam, Cap Screw, ARP L19, Bushed, Ford, Powerstroke, Diesel, 6.0L, Set of 8
Part Number: CPI-U13100
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Connecting Rods, Ultra, I-beam, Forged 4330 Steel, 6.125 in. Length, Floating, Chevy, Small Block, Set of 8
Part Number: CPI-U14140
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Connecting Rods, Ultra Enforcer, Forged 4340 Steel, I-Beam, Cap Screw, ARP L19 Alloy, Bushed, 6.200 in. Length, Chevy, Small Block, Set of 10
Part Number: CPI-U14245-V10
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
ULTRA I-BEAM FORD 6.250 SJ - MP3.5 BOLTS
Part Number: CPI-U14851-3-5
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
ULTRA SPRINT 5.850-SJ TAPERED H-BEAM .905 BE THICKNESS 1.600" MP3.5 BOLTS NO BUSHING
Part Number: CPI-U16131-3-5
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
ULTRA H-BEAM ROD BBC 7.100 2.200
Part Number: CPI-U16250
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
McLaren 5.162 I-BEAM, CA Bolts
Part Number: CPI-U16520-CA
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
CALLIES SBC FORGED ULTRA DIRT 3.300/350/1.888
Part Number: CPI-SA3019A-UD
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
ULTRA DIRT CRANK 3.010 283 1.850
Part Number: CPI-SA7D5EA-UD
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
CALLIES FORGED ULTRA DIRT SB CRANK 3.750 / 350 / 2.000
Part Number: CPI-SAJ-14A-UD
Not Yet Reviewed
Estimated Ship Date: Nov 20, 2025 if ordered today
Estimated Ship Date: Nov 20, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.