Availability
MAGNUM 8CTWT LS CRANK 4.000 2.5585 2.1000
Part Number: CPI-5TO-31V-MG
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES Forged Ultra Dirt 3.600 LS Honda
Part Number: CPI-AP2239V-UD
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES LS ULTRA BILLET CRANK 4.600/2.559/2.100
Part Number: CPI-AP4531-UB
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
FORD ULTRA DIRT FORGED CRANK 4.000/2.750/2.000
Part Number: CPI-EFO-7PV-UD
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
MAGNUM FORD CRANK 4.250 351C 2.
Part Number: CPI-EFP-74V-MG
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES 351C ULTRA BOOST 4.125 / 351C / 2.100
Part Number: CPI-EFU-71-UB
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
FORD ULTRA DIRT FORGED CRANK 4.125/2.750/2.000
Part Number: CPI-EFU-7PV-UD
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
GM BB CHEVY CRANKSHAFT 4.375 2.750 2.200
Part Number: CPI-IBB-42B-GM
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES GEN 3 HEMI BILLET ULTRA BOOST 4.400 / 2.559 / 2.100
Part Number: CPI-YY59E1-UB
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES CRANK 3.630 GenIII Hemi Ultra boost
Part Number: CPI-YY77E1-UB
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES GEN 3 HEMI BILLET 3.500 STROKE 2.00 JOURNAL
Part Number: CPI-YYG-E4-UL
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
CALLIES GEN 3 HEMI BILLET 4.000 STROKE 2.100 JOURNAL
Part Number: CPI-YYO-E1-UB
Not Yet Reviewed
Estimated Ship Date: Oct 21, 2025 if ordered today
Estimated Ship Date: Oct 21, 2025 if ordered today
Crate Engine, Mopar 360 Small Block Stage 2, 320 HP, Long Block, External Engine Balance, Magnum Heads, Each
Part Number: HPE-HP73M
Not Yet Reviewed
Estimated Ship Date: Oct 15, 2025 if ordered today
Estimated Ship Date: Oct 15, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Assembled, Ford, 2.0L/122, Each
Part Number: VRE-DFF1
Not Yet Reviewed
Estimated Ship Date: Sep 3, 2025 if ordered today
Estimated Ship Date: Sep 3, 2025 if ordered today
Crate Engine, Remanufactured, Long Block, Ford, Mazda, 3.0L/182, Each
Part Number: VRE-DFW4
Not Yet Reviewed
Estimated Ship Date: Sep 3, 2025 if ordered today
Estimated Ship Date: Sep 3, 2025 if ordered today
Engine Block, Cast Iron, 4-Bolt Mains, 4.245 in. Diameter Bore, 2-Piece Rear Main Seal, Chevy, Big Block, Each
Part Number: WRL-095000
Estimated Ship Date: Aug 25, 2025 if ordered today
Estimated Ship Date: Aug 25, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Engines, Bare Block, Cast Iron, Merlin IV BBC, 10.200 in. Deck, 4.495 in. Bore, Splayed Billet Caps, Standard Cam Bearings and Lifter bores, Each
Part Number: WRL-095110
Not Yet Reviewed
Estimated Ship Date: Aug 25, 2025 if ordered today
Estimated Ship Date: Aug 25, 2025 if ordered today
Crate Engine, Marine, Long Block, Assembled, External Balance, Cast Iron Heads, Chevy, 454, Each
Part Number: HME-DMK2
Not Yet Reviewed
Estimated Ship Date: Oct 10, 2025 if ordered today
Estimated Ship Date: Oct 10, 2025 if ordered today
Crate Engine, Long Block, Aluminum Heads, Cast Iron Block, VVT Lock Out, Tuner, Ford Modular, 5.4L/330, Each
Part Number: HPE-HPDFDW
Not Yet Reviewed
Estimated Ship Date: Oct 20, 2025 if ordered today
Estimated Ship Date: Oct 20, 2025 if ordered today
SBC 225 CC PRO DESIGNED FULL CNC PORT AND CHAMBER 2.08/1.60 64CC CHAMBER 5 ANGLE VALVE JOB FULLY ASSEMBLED WIT
Part Number: PMX-9227
Not Yet Reviewed
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
SBC 225 CC PRO DESIGNED FULL CNC PORT AND CHAMBER 2.08/1.60 72CC CHAMBER 5 ANGLE VALVE JOB FULLY ASSEMBLED WIT
Part Number: PMX-92272
Not Yet Reviewed
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
Cylinder Heads, Shocker Series, Solid Roller, Assembled, Aluminum, 225cc Intake Runner, Chevrolet, Small Block, Pair
Part Number: PMX-9227A
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
SBC 225 CC PRO DESIGNED FULL CNC PORT AND CHAMBER 2.08/1.60 64CC CHAMBER 5 ANGLE VALVE JOB FULLY ASSEMBLED WIT
Part Number: PMX-9228
Not Yet Reviewed
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
SBC 225 CC PRO DESIGNED FULL CNC PORT AND CHAMBER 2.08/1.60 72CC CHAMBER 5 ANGLE VALVE JOB FULLY ASSEMBLED WIT
Part Number: PMX-92282A
Not Yet Reviewed
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
SBC 225 CC PRO DESIGNED FULL CNC PORT AND CHAMBER 2.08/1.60 64CC CHAMBER 5 ANGLE VALVE JOB FULLY ASSEMBLED WIT
Part Number: PMX-9228A
Not Yet Reviewed
Estimated Ship Date: Aug 14, 2025 if ordered today
Estimated Ship Date: Aug 14, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.