Availability
Front Runner Engine Drive System, Pulley kit, Serpentine, Standard ratio, Aluminum, Black, 6-groove, kit
Part Number: VTA-174020
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Roller, Advertised Duration 296/300, Lift .539/.548, Chevy, Small Block, Kit
Part Number: EDL-22015
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 75cc Chamber, 292cc Intake Runner, Ford, 429, 460, Each
Part Number: EDL-60679
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 63cc Chamber, 171cc Intake Runner, Mopar, 318, 340, 360, Each
Part Number: EDL-60775
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Performer RPM, Assembled, Aluminum, 75cc Chamber, 210cc Intake Runner, Chrysler, Big Block, Each
Part Number: EDL-60825
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, DHC™ 200, CNC Street Ported, Assembled, 1.46 in. Springs, With Accessory Holes, Chevy, Each
Part Number: TFS-30210007-C00
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, DHC™ 200, CNC Street Ported, Assembled, 1.46 in. Springs, No Accessory Holes, Small Chevy, Each
Part Number: TFS-30210003-C00
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, PowerPort® Cleveland 195, CNC Street Ported, Assy, 62cc Chamber, 1.46" Spring, Ford 351C, Each
Part Number: TFS-51616203-C00
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam/Lifters/Valvetrain, Hydraulic Roller Tappet, Adv. Duration 270/276, Lift .495/.502, Chevy, Small Block
Part Number: CCA-K12-422-8
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, High Port 240, Assembled, 67cc CNC Chambers, Ford, 289, 302, 351W, Each
Part Number: TFS-5171T016-C02
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 272/278, Lift .525/.525, Ford, Big Block FE, Kit
Part Number: HRS-CL250705-10
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 60cc Chamber, 170cc Intake Runner, Ford, 289, 302, 351W
Part Number: EDL-60225
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Race-Rite, Aluminum, Assembled, 119cc Chamber, 270cc Intake Runner, Chevy, 396, 402, 427, 454
Part Number: BRO-2061000SSCC
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS Piston and Rod Kit, 370 Cid., 4.030 bore, 3.622 stroke, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR360302
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 299/319, Lift .570/.554, Chevy, Big Block, Kit
Part Number: CCA-CL11-602-8
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, PowerPort® Cleveland 195, CNC Street Ported, Assy, 72cc Chamber, 1.46" Spring, Ford 351C, Each
Part Number: TFS-51617203-C00
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam/Lifters/Valvetrain, Hydraulic Roller Tappet, Adv. Duration 264/270, Lift .487/.495, Chevy, Small Block
Part Number: CCA-K12-412-8
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam/Lifter, Valvetrain, Hydraulic Roller Tappet, Advertised Duration 291/311, Lift .558/.542, Chevy Big Block
Part Number: CCA-K11-601-8
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pulleys, Sport Track, Serpentine, Performance Ratio, Billet Aluminum, Black Brackets, with P/S, with A/C, Chevy, Small Block, Long, Kit
Part Number: MCH-21690-08
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pro LS Crank and Rods, Forged 4340 Steel Crank, 4 in. Stroke, Forged 4340 Steel H-Beam Rods, 6.125 in. Rod Length, Chevy, LS, Kit
Part Number: SUM-CR4024125
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 266/274, Lift .510/.538, Chevy, Big Block, Kit
Part Number: HRS-CL120235-12
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cam/Lifters, Valvetrain, Hydraulic Roller Tappet, Advertised Duration 276/282, Lift .510/.510, Chevy, 396-454
Part Number: CCA-K11-423-8
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Engine Rotating Assembly, Series 9000, Cast Crank, Forged Pistons, I-Beam Rods, Ford, Small Block, Kit
Part Number: SCA-1-94165
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Performer RPM, CJ, Aluminum, Assembled, 75cc Chamber, 310cc Intake, Ford, 429, 460, Each
Part Number: EDL-61645
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 60cc Chamber, 190cc Intake Runner, Ford, 289, 302, 351W
Part Number: EDL-60255
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.