Availability
Belt, Poly Rib, Serpentine, 7-Rib, 97.30 in. Length, Each
Part Number: DAC-5070973
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Valve Lock, 7 degree, Steel, 3-groove, 0.312 in. Stem Diameter, Chrysler, Dodge, Jeep, Each
Part Number: CWA-53010515AA
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Piston Rings, Premium Ductile Ring Sets, Standard Size, 4.094 in. Bore, Plasma-moly, 1.2mm, 1.2mm, 2.0mm Ring Thickness, L8, V8, Set of 8
Part Number: HSN-2M5379
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Oil Filter, Select, Canister, Black, M22 x-1.5 Thread, 4.44 in. Tall, 2.94 in. Diameter, Anti-Drainback, Bypass Relief, Each
Part Number: KNN-SO-2011
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Idler Pulley, Serpentine, Steel, Black, Each
Part Number: RNB-419-602
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Valve Spring Retainers, OE Replacement, Steel, Chrysler, Dodge, Jeep, Ram, Gen III Hemi, Viper V10, Each
Part Number: MOP-53021676AB
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Rod Bearings, XP-Series, Tri-metal Copper-lead Nickel, Oil Clearance Is Increased 0.001 in., Chrysler, Dodge, Jeep, Ram, SRT, Set of 8
Part Number: KGB-CR8032XPSTDX
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Idler Pulley, Serpentine, Steel, Dodge, Jeep, Ford, Lincoln, Mercury, Each
Part Number: DAC-89048
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Timing Chain and Gear Set, Double Roller, Billet Steel Sprockets, Chrysler, Dodge, 5.7, 6.1L, Set
Part Number: HRS-94332
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Oil Filter Adapter, Threaded, Dodge, Chrysler, Jeep, Each
Part Number: MOP-53007563AB
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Oil Pan Drain Plugs, 1/2-20 in. Thread, Seal, Set of 5
Part Number: RNB-090-052
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Rod Bearings, XP-Series, Copper/Lead/Nickel, 0.010 Crankshaft Undersize, Chrysler, Dodge, Jeep, Plymouth, Set of 8
Part Number: KGB-CR805XPN010
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Oil Filter, Premium, OE Replacement, Canister, Buick, Cadillac, Chevy, Dodge, Ford, GMC, Jeep, Lincoln, Mazda, Mercury, RAM, Saab, Each
Part Number: BCH-3502
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Idler Pulleys, Professional, Serpentine, Steel, Black, for use on Acura®, for use on Honda®, Buick, Cadillac, Chevy, Ford, GMC, Isuzu, Jeep, Each
Part Number: ADO-38001
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Lifter, Hydraulic Roller, Chrysler, Dodge, Jeep, Ram, Each
Part Number: CWA-5184332AA
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Valve Covers, Stock Height, Perimeter Bolt Mounting, Fabricated Aluminum, Polished, Dodge, Jeep, Small Block Magnum, Pair
Part Number: PQX-4036001
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Oil Filter, Ultra, Canister Style, Each
Part Number: FRM-XG10060
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Connecting rod bearing set, Chrysler V8, 5.7L, 6.1L, 6.4L Hemi (o/s housing +.002")
Part Number: KGB-CR8048SM
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Lifter, Hydraulic Roller, OEM Replacement, Non DOD, Chrysler, Dodge, Jeep, Ram, Each
Part Number: MOP-05038787AD
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Camshaft Bearings CHRYSLER
Part Number: KGB-CS5512BB
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
VALVE, CRANKCASE VENT, 1994-2003
Part Number: MOP-05175352AA
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Idler Pulley, Smooth, Black Powdercoated, Each
Part Number: CEL-49001
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Oil Filter Relocation Kits, G3 Oil Filter Relocation Kit with 3/4 in.-16 Thread, Kit
Part Number: EAR-HEMI0004ERL
Not Yet Reviewed
Estimated Ship Date: Friday 12/26/2025
Estimated Ship Date: Friday 12/26/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.