Availability
Showing In Stock Items. Show All 15 Items.
Forged Pro SBC 4340 Forged Steel I-Beam Connecting Rods, 5.700 in. Length, .927 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-SBC57008I
Estimated Ship Date: Today
Estimated Ship Date: Today
BUILD IT WITH SUMMIT!
Forged Pro Small Block Chevy 4340 Forged Steel I-Beam Connecting Rod, 6 in. Length, .927 Floating Pin, 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-180SBC6000I
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, SIR I-Beam, Forged 5140 Steel, 5.700 in. Length Center To Center, Chevrolet, Small Block, Set of 8
Part Number: ESP-SIR5700SBLW
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, SIR I-Beam, 5.7 in. Length, Cap Screw, Press Fit, Chevy, Small Block, Set of 8
Part Number: ESP-5700SPLW
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 5.700 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-2570020P
Estimated Ship Date: Today
Estimated Ship Date: Today
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.000 in. Length, Chevy, Small Block, 1957-67, Set of 8
Part Number: SCA-2600020
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Chevy SB 6.000" Stroker - Boost Line Single
Part Number: BLN-SC6000-927S
Not Yet Reviewed
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Chevy SB 6.125" Stroker - Boost Line Single
Part Number: BLN-SC6125-927S
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.