Gearhead Gifts - Find the Perfect Gift for the Gearhead on Your List!

Gearhead Gifts - Find the Perfect Gift for the Gearhead on Your List!

It's the Season for Savings - Shop Holiday Deals Now!

CHEVROLET Summit Racing Engines & Components

Individual Parts

Results 1276 - 1300 of 1935

Engine Rebuild, Hypereutectic Flat, 4.000 in. Bore, .020 in. Rod, .020 in. Main, Chevy, 350, Kit

Part Number: SUM-SBCKIT3-022

Not Yet Reviewed

Cannot be shipped Internationally

...Loading

Cannot be shipped Internationally

Valvetrain Upgrade, Chevy, 4.8, 5.3, 5.7, 6.0L, Kit

Part Number: SME-K-14300

4.78 out of 5 stars ( 9 )

Estimated Ship Date: Mar 6, 2026 if ordered today

...Loading

Estimated Ship Date: Mar 6, 2026 if ordered today

Forged Pro pistons BB Chevy 540, 4.500 bore, 1.270 C.H., 4.25 in. stroke, 6.385 in. rod, 8cc open/closed ch. Dome 10.6@110cc, 10.2@114cc, 10:1@119cc.

Part Number: SUM-BBC540STD

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 289/300, Lift .525/.525, Chevy GM, LS/LSX, Gen III/IV, Kit

Part Number: SUM-8700-2-BHV

4.0 out of 5 stars ( 1 )

Cannot be shipped Internationally

...Loading

Cannot be shipped Internationally

Forged Pro pistons BB Chevy 502, 4.500 bore, 1.645 C.H., 4 in. stroke, 6.135 in. rod, 12cc open/closed chamber Dome 10.5@110cc, 10.2@114cc, 9.8@119cc.

Part Number: SUM-BBC502STD

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Forged Pro pistons BB Chevy 565, 4.600 bore, 1.120 C.H., 4.25 in. stroke, 6.535 rod, 8cc open/closed chamber Dome 11:1@110cc, 10.7@114cc, 10.2@119cc.

Part Number: SUM-BBC54046008L

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Engine Kit, Flat-Top Piston/Moly Ring, Rod, Main, Gaskets, Oil Pump, Timing Set, Chevy, 350, Kit

Part Number: SES-3480002000

Not Yet Reviewed

Cannot be shipped Internationally

...Loading

Cannot be shipped Internationally

Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 400 .010 undersize (thicker), 3/4 Upper and Lower groove, set

Part Number: SUM-1038H010

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Valve Spring, Single, 1.260 in. o.d., 358 lbs./in. Spring Rate, 1.750 in. Installed Height, Each

Part Number: SUM-174000-1

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Piston, Hypereutectic, Flat, 4.060 in. Bore, Chevy, Each

Part Number: SUM-17351C-60-1

Not Yet Reviewed

Estimated Ship Date: Nov 25, 2025 if ordered today

...Loading

Estimated Ship Date: Nov 25, 2025 if ordered today

SB Chevy Forged Steel crankshaft, 4.000 Stroke, 400 Mains, 2 Piece Rear Seal, Req. Narrowed Rod Bearings, Lightened, Nitride, 6.000 in. Rod

Part Number: SUM-SBC4004000

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Main Bearings, Race Series Main Bearing Sets, Stock Crankshaft Size, Tri-metal Copper-lead Alloy, Chevrolet, Big Block, Set of 5

Part Number: SUM-829HCS

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock

Part Number: SUM-326S434005-2

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC 2.100 pin, .708 Narrowed, Standard Clearance, set

Part Number: SUM-1227HCS

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Pistons, Hypereutectic, Dished, 4.000 in. Bore, Chevy, Set of 8

Part Number: SUM-17383C-00

3.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .001 undersize (thicker), Racing 270 Deg. Oil groove, set

Part Number: SUM-7298H01

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Valve Covers, Stock Height, Engine Dress Up, Breather, Timing Cover, Black Powdercoat, Chevy, Small Block, Kit

Part Number: SUM-7001SBS

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Engine Rebuild, Hypereutectic Flat Top, Plasmamoly Rings, Stock Bore, Bearings, Chevy, 5.7L, Kit

Part Number: CMB-08-0076

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.535 in. Length, .990 Floating Pin, ARP L19 260K PSI 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-BBC653519H

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, Chevy LS, .010 undersize (thicker), Racing 270 Deg. Oil groove, set

Part Number: SUM-7298HC10

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Duramax Crank And Cam Key, Set

Part Number: SUM-161002

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Rocker Arms, Gold Series, Full Roller, 1.6 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16

Part Number: SUM-G6821G

Not Yet Reviewed

Estimated Ship Date: Jan 8, 2026 if ordered today

...Loading

Estimated Ship Date: Jan 8, 2026 if ordered today

Main Bearings, 1/2 Groove, .001 in. Crankshaft Undersize, Bi Metal, Silicon Aluminum, Chevy, Small Block, Set of 5

Part Number: SUM-172001

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Nov 24, 2025 if ordered today

...Loading

Estimated Ship Date: Nov 24, 2025 if ordered today

Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8

Part Number: SUM-BBC63852H

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

PRO BBC H.R. 12 Hydraulic Roller Cam, 4/7 Swap, 276/285 Duration @ .050, 114 LSA + 8 Adv. , .700/.700 with 1.7 ratio, .741/.741 with 1.8, 4300-7200

Part Number: SUM-1262

Not Yet Reviewed

Estimated Ship Date: Monday 11/17/2025

...Loading

Estimated Ship Date: Monday 11/17/2025

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.