Availability
Lifter Guides, Set of 4 with 1163 Bolts, Hydraulic Roller Style, Plastic, Chevy, Original Best Quality GM Delphi LS-2, Non AFM/DOD Engines, Set of 4
Part Number: SUM-150133-4
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S43780-7F
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Engine Re-Ring, 4.040 in. Bore, .020 in. Rod, .020 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-422
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main .001 Extra Clearance, Half-Upper groove, set
Part Number: SUM-909HXS
Not Yet Reviewed
Estimated Ship Date: Jan 5, 2026 if ordered today
Estimated Ship Date: Jan 5, 2026 if ordered today
Lifters, Mechanical Roller, Link Bar, 0.842 in. Outside Diameter, 1.890 in. Seat Height, Chevy Big Block, Set of 16
Part Number: SUM-HT301-16
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Engine Rebuild, Hypereutectic Flat, 4.040 in. Bore, .010 in. Rod, .010 in. Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-411
Cannot be shipped Internationally
Cannot be shipped Internationally
Pro LS 2618 Forged Pistons. 3.820 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943820-2F
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Piston, 4.080 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-326943408012
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Piston, 4.040 bore, 1.326 C.H., 2cc Flat, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9
Part Number: SUM-3269454040-2
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC 2.000 pin, Doweled, .001 Extra Clearance, set
Part Number: SUM-745HXDS
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro SBC Stage 8 Hyd.Flat-Tappet 4/7 Firing Order Swap Cam, 252/258 Dur., 107 LSA + 1.5 Adv, .533/.540 1.5 Ratio, .569/.576 1.6 Ratio, 3200-7200 Range
Part Number: SUM-1207
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pan, Steel, Chrome, 7 Qt. Capacity, Chevy, LS, Each
Part Number: SUM-G3610
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons For SB Chevy 327, 4.030 bore, 1.671 C.H., 3.25 in. stroke, 5.7rod, 0cc net volume dome. 11:1@58cc, 10.2@64cc, 9.8@67cc, 9.3@72cc.
Part Number: SUM-SBC327030
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Cylinder Head Studs, Extreme Duty, 12-Point Head, Chevy Small Block V-8, 1955-1999, Kit
Part Number: SUM-910528-12PT
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Dipstick, Engine, Aluminum, Black Anodized, Chevy, Small Block, Pre-1980, Driver Side, Each
Part Number: SUM-G291B
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS 2618 Forged Piston, 4.005 bore, 1.326 C.H., 12cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9
Part Number: SUM-326945400512
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Pro LS Big Gun 2 Hydraulic Roller Cam, Stage 4.7, 242/251, 116 + 6, .625/.605 with 1.7, .662/.641 with 1.8, 3900-7200+ RPM, 6.2+, Each
Part Number: SUM-8730R1
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pump Fasteners, Studs, Steel, Black Oxide, Chevy, Big Block, Each
Part Number: SES-3-90-08-000
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main Standard Clearance, Half-Upper groove, set
Part Number: SUM-909HCS
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons for SB Chevy 400, 4.165 bore, 1.425 C.H., 3.75 in. stroke, 5.7 in. rod, 12cc Dish, 10.5@64cc, 10.2@67cc, 9.8@72cc.
Part Number: SUM-SBC40040
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Forged Pro pistons for SB Chevy 350, 4.030 bore, 1.560 C.H., 3.48 in. stroke, 5.7 in. rod, 5cc flat top 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72cc.
Part Number: SUM-SBC350030
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Cam and Lifter kit, Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7,9 LSA LSX
Part Number: SUM-K8709R1
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Piston, Forged, Flat, 4.030 in. Bore, Chevy, Each
Part Number: SUM-17360FC-30-1
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Main Bolts, Extreme Duty, 4-bolt Style, 6-point, Premium Quality, 190,000 psi Yield Strength, Washers, Chevy, Small Block, Kit
Part Number: SUM-910203-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Oil Pump and Pickup Assembly, High-Volume, Chevy, Big Block, Kit
Part Number: SES-3-90-08-004
Estimated Ship Date: Monday 11/17/2025
Estimated Ship Date: Monday 11/17/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.