Availability
BUICK REGAL Engines & Components
Cam Bearings, AL-3, Chevy, Small Block, V8, Kit
Part Number: CLE-SH1349S
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Main Bearings, P Series, 1/2 Groove, .020 in. Crankshaft Undersize, Tri Metal, Chevy, Small Block, Set of 5
Part Number: CLE-MS909P20
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, Plasma-moly, 4.039 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: HSN-2M139040
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Power Steering Pulley, V-belt Style, 1-groove, Steel, Chrome, 5.925 in. O.D., Press Fit, Each
Part Number: LSC-156
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Oil Filter, Racing, 13/16 in.-16 UNF Thread, 8 in. High, Each
Part Number: MOR-22461
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Rod Bearings, Direct Replacement, AL-5, Set of 8
Part Number: CLE-CB1776A8
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, Cast Iron, 4.030 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X30
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pulley, Power Steering, Saginaw, V-Belt, 2-Groove, Keyway, Steel, Chrome, 5.800 in. Diameter, Each
Part Number: LSC-161
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pulley, Power Steering, Saginaw, V-Belt, 1-Groove, Keyway, Steel, Chrome, 5.800 in. Diameter, Each
Part Number: LSC-160
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Oil Pickup, Bolt-In, Stock Pan Style, 0.625 in. Tube Diameter, GM, Oldsmobile, 260-455 V8, Each
Part Number: MEL-22-FHVS
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, 4.020 in. Bore, 5/64, 5/64, 3/16, .200 in. Deep Oil Groove, Moly Top Ring, Set
Part Number: SLP-E-251K20
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Timing Chain and Gear Set, Double Roller, Chevy, GMC, Pontiac, V6/V8, Set
Part Number: MEL-3-163S
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Cam Bearing, Pontiac, 195 L4/265/301/326/350/389/400/421/428/455, V8, Set
Part Number: SLP-1220M
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Main Bearings, .010 in. Over Size, Tri Metal, 1/2 Groove, Chevrolet, Small Block, Set of 5
Part Number: SLP-4663M10
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, Phosphate Coated, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: HSN-139
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Timing Chain and Gear Set, Street True Roller, Double Roller, Iron/Steel Sprockets, Chevy, Small Block, Set
Part Number: CLO-9-1100SP
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Idler Pulley, 90mm Diameter, 30mm Thick, Serpentine, Flat/No Grooves for 6-Rib Width Belts, 17mm Bearing Inside Diameter, Steel, Black, Each
Part Number: DAC-89006
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Lifter, Hydraulic Roller, 0.842 in. O.D., Chevy, Each
Part Number: ADO-HL124
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Cover Breather, Twist-On, Round, Plastic, Black, Each
Part Number: XPF-ZZ-VCBRTH-V2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pulley, Power Steering, Saginaw, V-Belt, 2-Groove, Keyway, Steel, Black, 5.800 in. Diameter, Each
Part Number: LSC-163
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Oil Filter, HP Series, 13/16-16 in. Thread, 4.010 in. High, Each
Part Number: FRM-HP8
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Rings, Cast Iron, 4.040 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SLP-E-251X40
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Cover Hold, Down Tabs, Steel, Chevy, Pontiac, V6/V8, Set of 4
Part Number: FEL-ES72676
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Freeze Plug Kit, Brass, Chevy, Small Block, Kit
Part Number: PIO-PE-100-B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster