Availability
Pro LS Piston and Rod Kit, 325 Cid, 3.780 bore, Standard 3.622 stroke, 6.125 rod, 2cc dome, 10.9:1 @ 61cc, 10.3:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L7802
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .002 undersize (thicker), Racing 270 Deg. Oil groove, set
Part Number: SUM-7298H02
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Dipstick, Engine, Aluminum, Black Anodized, Chevy, Small Block, Pre-1980, Driver Side, Each
Part Number: SUM-G291B
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Kit, Crank, Flat-Top Piston/Moly Ring, Rod, Main, Gaskets, Oil Pump, Timing Set, Chevy, 355, Kit
Part Number: SES-3483002050
Cannot be shipped Internationally
Cannot be shipped Internationally
Forged Pro pistons for 302 Windsor, 4.030 bore, 1.605 C.H., 3 in. stroke, 5.090 in. rod, 3cc dome 10.7@58cc, 10.4@60cc, 9.9@64cc, 9.7:1@ 66cc.
Part Number: SUM-SBF302030D
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 3.790 in. Bore, File Fit, Gas Nitrided, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP379015
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, Plain, Silver Powdercoat, Pair
Part Number: SUM-440824
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifter kit, Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-K8710R1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 351 Windsor .010 undersize (thicker), 3/4 Upper and Lower groove, set
Part Number: SUM-1432H10
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Pointer, Billet Aluminum, Black Anodized, Chevy, 7 in. Balancer, Small Block, Each
Part Number: SUM-G6312-7
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifter kit, Muscle Car Cam, Ram Air IV, Hydraulic Flat Tappet, 2,200-5,400 RPM Range, 304 int./316 exh., Lift 231 int./240 exh., Pontiac, Ea
Part Number: SUM-K2821
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Piston Rings, Iron, 4.290 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-135-2M551940
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 Extra Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HXS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pulley Spacer, Crankshaft, 4-bolt, Aluminum, Natural, 0.875 in. Thickness, Ford, Each
Part Number: SUM-329708
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Gen. V LT, .837 width, .001 Extra Clearance, set
Part Number: SUM-7281HXS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Rebuild, Hypereutectic Flat, 4.060 in. Bore, Standard Rod, Standard Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-600
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Combo, Engine Oil Change Kit, 5W30 6 Qts., Kit
Part Number: CMB-08-0098
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Piston Rings, Pro GPX Gas Ported, 3.307 in. Bore, File Fit, Gas Nitrided, 1.0mm, 1.2mm, 2.8mm Thickness, Single Piston Set,
Part Number: SUM-GP8400XX
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, BBC, Narrowed, Doweled, .001 Extra Clearance, set
Part Number: SUM-743HXNDS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Drain Plug, Oil Pan, Valve, EZ Oil Drain Valve, PF-3/8, Seal, Each
Part Number: SUM-Z102
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Chevy, Big Block, Set
Part Number: SUM-G6511
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar BB, Dowled, .010 undersized (thicker), set
Part Number: SUM-527HD010
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro Hemi Stage 6 Hydraulic Roller Cam, 232/248 Duration @.050, 120 LSA + 4 adv, .625/.625 Lift, 3500-7500 Range, Each
Part Number: SUM-5719
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS Big Gun 2 Hydraulic Roller Cam, Stage 4.7, 242/251, 116 + 6, .625/.605 with 1.7, .662/.641 with 1.8, 3900-7200+ RPM, 6.2+, Each
Part Number: SUM-8730R1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Oil Dipstick, Oil Pan Entry, Aluminum Handle, Steel Tube, Chrome, Each
Part Number: SUM-G3868
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.