Spooktacular Savings - Shop the Halloween Sale Now!

Spooktacular Savings - Shop the Halloween Sale Now!

Save Now on Winter Essentials for Your Ride!

Summit Racing Engines & Components

Individual Parts

Results 1476 - 1500 of 2000 +

Piston Rings, Pro GPX Gas Ported, 4.165 in. Bore, File Fit, Gas Nitrided, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set

Part Number: SUM-GP416515

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Pro Hemi Supercharged 2 Cam, MDS Delete, Phaser Limited or Delete, 212/224 Duration @.050, 115.5 LSA + 2.5 adv, .625/.625 Lift, 2700-6700 Range, Each

Part Number: SUM-5715

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Forged Pro pistons BB Chevy 427, 4.310 bore, 1.765 C.H., 3.76 in. stroke, 6.135 in. rod, 27cc open/closed ch. Dome 10.5@110cc, 10.1@114cc, 9.7@119cc.

Part Number: SUM-BBC427060

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Cam and Lifter kit, Muscle Car Cam,335HP383, Hydraulic Flat Tappet, 2,000-5,000 RPM Range, Advertised Duration 302/324, Lift .447/.459, Mopar, Each

Part Number: SUM-K6420

Not Yet Reviewed

Cannot be shipped Internationally

...Loading

Cannot be shipped Internationally

SUM-8728 Pro LS Big Truck Torkinator Level 2 Cam Kit, Beehive Springs, Seals, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec

Part Number: SUM-8728-2-BHV

Not Yet Reviewed

Cannot be shipped Internationally

...Loading

Cannot be shipped Internationally

Drain Plug, Oil Pan, Valve, EZ Oil Drain Valve, 14mm x 1.5, Seal, Each

Part Number: SUM-Z106

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Rocker Arm Nuts, Replacement Ball and Nut Kit for SUM-G6802/G6803, Set of 8

Part Number: SUM-G6803-K

3.8 out of 5 stars ( 5 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Piston Rings, Pro GPX Gas Ported, 4.070 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set

Part Number: SUM-GP407012

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Piston Rings, Gas Nitride Steel Top, Ductile second, Std. Tension oil, File Fit for 4.150 in. bore 1.2mm, 1.2mm, 3.0mm, Set

Part Number: SUM-136SN9050025

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Timing Cover, 1-Piece, Steel, Black Powdercoated, Chevy, Big Block, Kit

Part Number: SUM-G3201B-K

1.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Piston Rings, Plasma-Moly, 4.000 in. Bore, 1/16 in., 1/16 in., 3/16 in. Thickness, 8-Cylinder, Set

Part Number: SUM-134-CM553200

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Hemi Beehive Springs, .680 Max Lift @ 150 Lb. seat @ 1.800 Installed, 429 @1.120 Open. 1.070 C.B., 1.290 Dia., 410 Rate, Like PAC 1276X PSI 1516

Part Number: SUM-174015BP-16

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Pro SBF Best Hydraulic Roller Cam 10, 252/264 Duration, 109 LSA + 3 Adv. .587/.587 lift 1.6 ratio, .625/.625 lift 1.7 ratio, 4,000-7,500 basic rpm

Part Number: SUM-8910

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Main Bearings, 1/2 Groove, .020 in. Crankshaft Undersize, Bi Metal, Silicon Aluminum, Ford, 221-302, Set of 5

Part Number: SUM-172120

4.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 302/302, Lift .500/.500, Chevy, Small Block, Kit

Part Number: SUM-K00112

4.25 out of 5 stars ( 8 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Alternator Bracket, Side Mount, Chrome, Header mount, Drivers side, Use with SUM-G4050, Chevy, SBC, Each

Part Number: SUM-G4051

4.46 out of 5 stars ( 13 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Summit Precision Cam Bearings, Chevy LS first design 1997-03

Part Number: SUM-1000S00

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Valve Cover Breather, Clamp-On, Round, Steel/Rubber, Chrome/Black, 1 1/2 in. Nipple, Summit Racing™ Logo, Each

Part Number: SUM-G3406

4.71 out of 5 stars ( 7 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Pro LS 4340 Piston and Rod Kit, 365 Cid., 4.005 bore, 3.622 stroke, 6.125 rod, 12cc Dish, 9.6:1 @ 65cc, 9.2:1 @ 70cc, File-Fit Rings

Part Number: SUM-PR36L00512

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Pro LS 4340 Piston and Rod Kit, 346 Cid., 3.898 bore, 3.622 stroke, 6.125 rod, 7cc dish, 9.7:1 @ 65cc, 9.4:1 @ 68cc, File-Fit Rings

Part Number: SUM-PR36L8987

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Valve Cover Grommets, Rubber, Chevy, GMC, Hummer, Pontiac, Chevy/GM, LS/LSX, Gen III/IV, Set of 8

Part Number: SUM-110570

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Oil Fill Cap, Screw-In, Billet Aluminum, Black Anodized, -16 AN, Chevrolet, V8, LS, Each

Part Number: SUM-440368B

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Combo, Aluminum, Cylinder Heads, Manifold, Cam/Lifters, Gaskets, Bolts, SB Chevy

Part Number: SME-K-400-390

4.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Oil Pan, Steel, Spin-On Filter, Chrome, 7 Qt. Capacity, Chevy, LS, Kit

Part Number: SUM-G3612C-K

3.8 out of 5 stars ( 5 )

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 298/309, Lift .612/.612, Chevy GM, LS/LSX, Gen III/IV, Each

Part Number: SUM-8702-1DS

Not Yet Reviewed

Estimated Ship Date: Monday 11/3/2025

...Loading

Estimated Ship Date: Monday 11/3/2025

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.