Availability
Valve Cover PCV Valve, Push-In, Round, Aluminum, Polished, Ball Milled, Each
Part Number: SUM-G3409
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cylinder Head Fasteners, Extreme Duty, 12-point, Chromoly, Black Oxide, Washers, 2011-22 Ford, 6.7L Powerstroke Diesel, Kit
Part Number: SUM-910519
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, BBF 460 Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1039HS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Piston Rings, Pro GPX Gas Ported, 4.625 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3.0mm Thickness, V8, Set
Part Number: SUM-GP462543
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro SBC Best Hydraulic Roller Cam 6, LS Firing Order, Roller Block, 236/248 Dur.110.5 LSA + 3.5 Adv. .550/.550 lift with 1.5 rocker,.587/.587 1.6, ea
Part Number: SUM-8811
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro SBC Best Hydraulic Roller Cam 7, LS Firing Order, Roller Block, 242/256 Dur.110.5 LSA +3.5 Adv. .550/.550 lift with 1.5 rocker,.587/.587 1.6, ea
Part Number: SUM-8812
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pistons, Forged, Flat, 4.060 in. Bore, Chevy, Set of 8
Part Number: SUM-17365FC-60
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Covers, Aluminum, Copper Plated, Tall, Finned, Chevy, 5.0/5.7L, Pair
Part Number: SUM-440417CPR
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Engine Bolts, Stainless Steel, Polished, Hex Head, Ford, 221-302, 351W, Kit
Part Number: SUM-56250HSP
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, AMC, V8, Set
Part Number: SUM-G6508
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943780-7F
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Pro LS S.P.6 Cam, 256/270 Duration, 108 LSA + 4 Adv, .625/.625 lift, 3-Bolt, compatible with SUM-174005 springs. Gen. 3/4 5.3 5.7 6.0 6.2 7.0
Part Number: SUM-8745R1
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump and Pickup Assembly, High-Volume, Ford, Small Block, Kit
Part Number: SES-5-60-08-008
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Pontiac, V8, Set
Part Number: SUM-G6612R-B
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Cover Breather, Push-In, Round, Steel/Rubber, Chrome/Black, Summit Racing™ Logo, Each
Part Number: SUM-G3405
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
LOW MOUNT ALT BRACKET SBC/BBC
Part Number: SUM-342000
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pump and Pickup Assembly, High-Volume, Chrysler, Small Block, Kit
Part Number: SES-4-60-08-019
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Drain Plug, Oil Pan, Valve, EZ Oil Drain Valve, 12mm x 1.75, Seal, Each
Part Number: SUM-Z107
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam Gear Bolt, High Performance, Chromoly, Hex Head, With Spring and Pin, Jeep, 2.5L, 4.0L, 4.2L, Kit
Part Number: SUM-G1797
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Oil Pan Drain Plug, Magnetic, Steel, Zinc Plated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102Z
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 351 Windsor .001 Extra Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1432HXS
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Valve Covers, Tall, Cast Aluminum, Finned, Black, Dodge, Mopar, Small Block Magnum, Pair
Part Number: SUM-440425B
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Cam and Lifter kit, Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order, 242/251 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, 2600-6600 RPM Range
Part Number: SUM-K1225
Not Yet Reviewed
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-1DS
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Replacement Valve Cover Bolts, Centerbolt, Chevy, Small Block, Set of 8
Part Number: SUM-G3314BK
Estimated Ship Date: Tuesday 9/2/2025
Estimated Ship Date: Tuesday 9/2/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.