Availability
Valve Covers, Steel, Chrome, Tall, Flames, Chevy, Small Block, Pair
Part Number: SUM-G3393
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
SUM-8722 Level 1 Cam Kit with Beehive Springs, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0
Part Number: SUM-8722-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Pointer, Billet Aluminum, Black Anodized, Adjustable, 6.375 in. Balancer, Chevy, Small Block, Each
Part Number: SUM-163638
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Cover, One-piece, Steel, Chrome, Dodge, Big Block, Kit
Part Number: SUM-G3335
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Valve Covers, Aluminum, Finned, Polished, Stock Height, Chevy, LS, Pair
Part Number: SUM-440500
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Pushrods, Steel, 5/16 in. Diameter, 7.389 in. Overall Length, Set of 16
Part Number: SUM-G6420
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Cylinder Head Bolts,Extreme Duty, 6-point, 8740 Chromoly, Black Oxide, 7/16-14 in. Thread, Premium Quality, Chevy, Small Block, Kit
Part Number: SUM-910200-PRO
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.850 in. Length, Universal, Set of 16
Part Number: SUM-1457850
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Pulley Set, Serpentine, 25% Underdrive, Steel, Ford, Lincoln, Mercury, 4.6L, Kit
Part Number: SUM-C2512
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Piston, Hypereutectic, Flat, 4.000 in. Bore, Chevy, Each
Part Number: SUM-17351C-00-1
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 210/218 Dur.@ .050 112 LSA +1 Adv. Lift .500/.500, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8712-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Piston Rings, Pro GPX Gas Ported, 4.610 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3.0mm Thickness, V8, Set
Part Number: SUM-GP461043
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Crankshaft Pulley, V-Belt, 2-Groove, 7.28 in., Steel, Chrome, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3953
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Piston Rings, Pro GPX Gas Ported, 4.030 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3.0mm Thickness, V8, Set
Part Number: SUM-GP403043
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Power Steering Pulley, V-Belt, 1-Groove, Aluminum, Polished, .625 in. Bore, Chevy, Each
Part Number: SUM-340101
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Oil Pan Drain Plug, Magnetic, Steel, Zinc Plated, Neodymium Super Magnet, 1/2-20 RH in. Threads, Copper Seal, Each
Part Number: SUM-120102Z
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Timing Chain and Gear Set, Double Roller, Steel Sprockets, Chevy, V6/V8 Small Block, Set
Part Number: SME-7000
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Rim Screw Template, Aluminum, 15 in. Wheel, 16 Holes, Each
Part Number: SUM-751497
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Piston Rings, Pro GPX Gas Ported, 4.375 in. Bore, File Fit, Gas Nitrided, 1/16 in., 1/16 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP437516
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Cylinder Head Studs, Extreme Duty, 12-Point, Chromoly, Black Oxide, 5.9 Cummins 12 valve, Kit
Part Number: SUM-910510
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Engine Rebuild, Hypereutectic Flat, 4.060 in. Bore, .030 in. Rod, .030 in. Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT3-633
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Pushrods, Steel, Heat-Treated, 5/16 in. Diameter, 7.894 in. Length, Universal, Set of 16
Part Number: SUM-G6400100
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Oil Pump and Pickup Assembly, High-Volume, 6.125 in. Pan Depth, Chevy, Small Block, Kit
Part Number: SES-3-60-08-100
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Valve Spring Retainers, Steel, Beehive, 7 Degree, Non LS, 11/32 in. 1.060 in. Outside Diameter, 0.640 in. Inside Diameter, Each
Part Number: SUM-174003-3-1
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Rocker Arm, LS, Roller Fulcrum, 1.7 Ratio, Ductile Iron, Pedestal Mount, Chevy, 6.2L LS, Each
Part Number: SME-143023
Not Yet Reviewed
Estimated Ship Date: Monday 10/13/2025
Estimated Ship Date: Monday 10/13/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.