Availability
Pistons, Hypereutectic, Flat, 4.020 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-20
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Ductile Plasma Iron Top, Ductile second, Std. Tension oil, File Fit for 4.155 in. bore 1.5mm, 1.5mm, 3.0mm, Set
Part Number: SUM-1362M8505035
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro LS 2618 Forged Piston, 4.000 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943400012
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Pro GPX Gas Ported, 4.125 in. Bore, File Fit, Gas Nitrided, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP412515
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Gears, 1-Piece/2-Piece Eccentric, Ford, 429/460, Set
Part Number: SUM-G6631R-B
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cam and Lifter KIt Muscle Car Replacement SBC Flat tappet hydraulic,L-82 350 hp 350 Cam with Lifters
Part Number: SUM-K1122
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Pro LS Rotating Assembly, 325 Cid., 3.780 bore, Standard 3.622 stroke, 24X, 6.098 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R24367807
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Guideplates, Flat, 5/16 in. Pushrod Size, Chevy, Small Block, Set of 8
Part Number: SUM-G6450
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro LS Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 24X, 6.098 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24360302
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Main Bolts, Side Bolts Only, 6-bolt Style, Hex, Chevy, LS, Set of 10
Part Number: SUM-910229-3
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 280/280, Lift .443/.443, Chevy, Small Block, Kit
Part Number: SUM-K00042
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Summit HDR LS1 LS2 LS3 LQ9 11/32 7.425 Length, Premium One-Piece .120 Wall 4130 Seamless Chromoly Pushrods, 210 degree ends Heat-Treated, Set of 16
Part Number: SUM-14917425
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Oil Filter, Canister, 13/16-16 in. Thread, 3.110 in. High, Each
Part Number: SUM-127007
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 282/292, Lift .486/.512, Ford, 351C, 351M, 400
Part Number: SUM-K5200
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro LS Rotating Assembly, 364 Cid., 4.000 bore, 3.622 stroke, 58x, 6.125 rod, 2cc Flat Top, 10.7:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R5836L0002
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.950 in. Length, Universal, Set of 16
Part Number: SUM-1457950
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro LS 4340 Piston and Rod Kit, 403 Cid., 4.005 bore, 4.000 stroke, 6.125 rod, 8cc dish, 11:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR400058
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Natural Finish, Includes Bolts, Grommets, Gaskets, Right/Passenger Side, GM LS, Each
Part Number: SUM-440555
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Oil Filler Cap, Steel, Natural, Twist-In, GM, Mopar, Ford, AMC, Jeep, International, Each
Part Number: SUM-380180
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Camshaft, 2011-20 6.4 Charger, Challenger Durango Grand Cherokee VVT, Replaces MDS 05038419AB with no MDS, 273/276 Adv. Dur., 0.582/0.546 Lift, Each.
Part Number: SUM-5703
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Bellhousing Dowel Pins, .500 in. Diameter, .014 in. Offset, Ford, Mopar, Lincoln, Mercury, Pair
Part Number: SUM-192007
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Summit HDR LS1 LS2 LS3 LQ9 Pushrods 5/16 7.350 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14957350
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 302/302, Lift .500/.500, Chevy, Small Block, Kit
Part Number: SUM-K00112
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cylinder Head Studs, 12-Point, 8740 Chromoly, Black, 2004 and Later, Chevy, LS, Gen III/IV, 1/2" x 13 threads base, 1/2" - 20 top, Kit
Part Number: SUM-900508
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Oil Pan, Steel, Chrome Plated, 5 qt., Chevy, Small Block, 2-Piece Rear Main, Passenger Side Dipstick, Each
Part Number: SUM-G3501
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.