Availability
Summit Precision High-Tensile Tri-metal Alloy Racing Main Bearings, Ford Cleveland Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1010HS
Not Yet Reviewed
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Piston Rings, Pro HEMI, 4.085 in. bore, File-fit 1.2mm Nitride Steel Top, 1.2mm Ductile Second, 3.0mm Std. Tension Oil, 8 Cylinders, Set
Part Number: SUM-408512
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston, Pro LS, 3.780 in. Bore, Forged Aluminum, Dome, 0.943 Pin Diameter, Chevy, Each
Part Number: SUM-326S43780-2F
Not Yet Reviewed
Estimated Ship Date: Nov 24, 2025 if ordered today
Estimated Ship Date: Nov 24, 2025 if ordered today
Piston Rings, Plasma-Moly, 4.000 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-134-CM553100
Estimated Ship Date: Today
Estimated Ship Date: Today
SB Chevy Forged Steel crankshaft, 3.750 Stroke, Two Piece Rear Seal, Req. Narrowed Rod Bearings, Lightened, Nitride, Designed for 6.000 in. Rod
Part Number: SUM-SBC4003750
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Balancer Counterweight, Ford, Small Block, 28 oz., use with SUM-C4269 or SUM-C4270, Each
Part Number: SUM-35269
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Rebuild, Hypereutectic Dish, 4.060 in. Bore, Standard Rod, Standard Main, Chevy 383
Part Number: SUM-SBCKIT2-600
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Engine Rebuild, Hypereutectic Dish, 4.030 in. Bore, Standard Rod, Standard Main, Chevy, 383
Part Number: SUM-SBCKIT2-300
Cannot be shipped Internationally
Cannot be shipped Internationally
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, BBC, Doweled, .010 undersize (thicker), set
Part Number: SUM-743HDC10
Estimated Ship Date: Today
Estimated Ship Date: Today
Forged Pro pistons BB Chevy 540, 4.500 bore, 1.270 C.H., 4.25 in. stroke, 6.385 in. rod, 8cc open/closed ch. Dome 10.6@110cc, 10.2@114cc, 10:1@119cc.
Part Number: SUM-BBC540STD
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Valvetrain Upgrade, Chevy, 4.8, 5.3, 5.7, 6.0L, Kit
Part Number: SME-K-14300
Estimated Ship Date: Feb 2, 2026 if ordered today
Estimated Ship Date: Feb 2, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Forged Pro pistons BB Chevy 565, 4.600 bore, 1.270 C.H., 4.25 in. stroke, 6.385 rod, 8cc open/closed chamber Dome 11:1@110cc, 10.7@114cc, 10.2@119cc.
Part Number: SUM-BBC5404600
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Re-Ring, 4.030 in. Bore, .020 in. Rod, .020 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-322
Estimated Ship Date: Today
Estimated Ship Date: Today
Piston Rings, Pro GPX Gas Ported, 3.504 in. Bore, File Fit, Gas Nitrided, 1.0mm, 1.2mm, 2.8mm Thickness, Single Piston Set, V8, Set
Part Number: SUM-GP8900XX
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Forged Pro pistons BB Chevy 565, 4.600 bore, 1.120 C.H., 4.25 in. stroke, 6.535 rod, 8cc open/closed chamber Dome 11:1@110cc, 10.7@114cc, 10.2@119cc.
Part Number: SUM-BBC54046008L
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Forged Pro pistons BB Chevy 502, 4.500 bore, 1.645 C.H., 4 in. stroke, 6.135 in. rod, 12cc open/closed chamber Dome 10.5@110cc, 10.2@114cc, 9.8@119cc.
Part Number: SUM-BBC502STD
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Engine Rebuild, Hypereutectic Flat, 4.060 in. Bore, .010 in. Rod, .010 in. Main, Chevy, 350, Kit
Part Number: SUM-SBCKIT1-611
Cannot be shipped Internationally
Cannot be shipped Internationally
Valve Covers, Stock Height, Engine Dress Up, Breather, Timing Cover, Black Powdercoat, Chevy, Small Block, Kit
Part Number: SUM-7001SBS
Estimated Ship Date: Today
Estimated Ship Date: Today
Summit 4340 Forged Crankshaft, SBF Windsor, 3.000 in Stroke, 28 oz. Balancer, Narrowed Rod Bearings, 1.375 Pilot Bearing, Designed for 5.090 in. Rod
Part Number: SUM-SBF3023000E
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Valve Covers, Aluminum, Polished, Tall, Finned, Chevy, Big Block, Pair
Part Number: SUM-440423
Not Yet Reviewed
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 289/300, Lift .525/.525, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8700-2-BHV
Cannot be shipped Internationally
Cannot be shipped Internationally
Oil Pan Fasteners, Bolt, Zinc Plated, Hex Head, Kit
Part Number: SUM-G1573F
Not Yet Reviewed
Estimated Ship Date: Today
Estimated Ship Date: Today
Summit HDR LS1 LS2 LS3 LQ9 11/32 7.450 Length, Premium One-Piece .120 Wall 4130 Seamless Chromoly Pushrods, 210 degree ends Heat-Treated, Set of 16
Part Number: SUM-14917450
Estimated Ship Date: Today
Estimated Ship Date: Today
Summit HDR LS1 LS2 LS3 LQ9 Pushrods 5/16 7.425 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14957425
Not Yet Reviewed
Estimated Ship Date: Oct 24, 2025 if ordered today
Estimated Ship Date: Oct 24, 2025 if ordered today
Summit HDR Pushrods 5/16 6.500 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14956500
Estimated Ship Date: Nov 17, 2025 if ordered today
Estimated Ship Date: Nov 17, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.