Availability
Vacuum Pump, Black, 23 in/hg Maximum Vacuum, 12 V DC, Internal Vacuum Control, 7.75 in. Height, 6.5 in. Length, 6 in. Width, Each
Part Number: SUM-760140-B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Ford Windsor, 185 cc Int. Runner, 64cc Chamber, 2.02 Int./1.6 Exh. Hyd. Roller .600 Lift, 351W 1/2 in. head bolt, reducer sleeve needed for 289/302
Part Number: SUM-162SBF185WIN
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order Cam, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, .560/.555 1.6 Ratio, 1800-6250 RPM Range
Part Number: SUM-1222
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arms, 1.6 Ratio, 3/8 in. Stud, Full Roller, Stainless Steel, Polished, Small Block Ford, SBF, Set of 16
Part Number: SUM-G6996
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Small Block, Each
Part Number: SUM-G3600
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Spring Retainers, Steel, Beehive, 7 Degree, Non LS, 11/32 in. 1.060 in. Outside Diameter, 0.640 in. Inside Diameter, Set of 16
Part Number: SUM-174003-3
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Adapter, Oil Filter, Bypass, Bolt-On, Aluminum, Natural, 13/16-16 in. Thread, Each
Part Number: SES-3-60-08-900
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Black Zinc, 6 qt., Chevy, Big Block, Each
Part Number: SUM-G3605
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS Piston and Rod Kit, 325 Cid., 3.780 bore, Standard 3.622 stroke, 6.098 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR367807
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crankshaft, 2-Piece Seal, External Balance, Cast Steel, 4.000 in. Stroke, Chevy, 454, Each
Part Number: SUM-180370
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.135 in. Length, 650 HP, Chevy, Big Block, Set of 8
Part Number: SUM-180375B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Forged Pro Ford BB 460 4340 Forged Steel H-Beam Connecting Rod, 6.605 in. Length, 1.040 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBF66058H
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
PCV Valve, 90 Degree, Billet Aluminum, Polished, 1.22 in. O.D., 3/8 in. Hose Barb, Each
Part Number: SUM-440308
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pan, Steel, Natural, 6 qt., Chrysler, 426, 440, Each
Part Number: SUM-G3511
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Connecting Rods, Performance, I-beam Style, Forged 4340 Steel, 6.098 in. Length Center To Center, Chevrolet, 5.3L, 5.7L, 6.0L, 6.2L LS, Set of 8
Part Number: SUM-LS6098945I
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Chevrolet, Small Block, Set of 5
Part Number: SUM-172000
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Chevy, Big Block, Set
Part Number: SUM-G6610R-B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, Crank Pulley, 25 Percent Underdrive, SFI, Internal Balance, Short Spacing, 5.7, 6.0, 6.2L, Each
Part Number: SUM-C2503
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order Cam, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, .587.576 1.6 Ratio, 2000-6300 RPM Range
Part Number: SUM-1223
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crankshaft, 2-piece Seal, External Balance, Cast Steel, 3.750 in. Stroke, Chevy, Small Block, Each
Part Number: SUM-180367
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, OEM, External Balance, Nodular Iron, Natural, Chevy, Big Block, Each
Part Number: SUM-162454
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Big Nasty 5/4 Race Cam for LS, SUM-174002 .550 lift springs required. Pushrods or Flycutting not required. ALL the CHOP...tuning required.
Part Number: SUM-8733R1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Pro SBC Retrofit Stage 2 Hyd.Roller LS Firing Order, 218/227 Dur., 110 LSA + 1 Adv, .525/.520 1.5 Ratio, 1800-6250 RPM Range
Part Number: SUM-K1222
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 222/232 Dur.@ .050 112 LSA +5 Adv. Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8713-1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.