Availability
Valve Cover Grommet, Baffled, Breather, 1.22 in. Outside Diameter, 1 in. Inside Diameter, Each
Part Number: SUM-G3413
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro Hemi Supercharged 6 Cam, MDS Delete, Phaser Limited or Delete, 232/248 Duration @.050, 120 LSA + 4 adv, .625/.625 Lift, 3400-7500 Range, Each
Part Number: SUM-5719
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, BBC .010 undersize (thicker), set
Part Number: SUM-743H010
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Combo, Oil Pan, Black Zinc, Pickup, Std-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, Small Block, Kit
Part Number: SUM-PANKIT5
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Oil Pump Fasteners, Studs, Steel, Black Oxide, Chevy, Small Block, Each
Part Number: SES-3-60-08-000
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Covers, Tall, Fabricated Aluminum, Black Powdercoated, Summit® Logo, Chevy, Small Block, Pair
Part Number: SUM-440602-L
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pushrods, Steel, 5/16 in. Diameter, 8.575 in. Length, Universal, Set of 16
Part Number: SUM-G6409
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Pro GPX Gas Ported, 4.065 in. Bore, File Fit, Gas Nitrided, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP406515
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Piston Rings, Pro GPX Gas Ported, 4.600 in. Bore, File Fit, Gas Nitrided, 0.043 in., 0.043 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP4600446
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Gen. V LT, .837 width, .010 undersize (thicker), set
Part Number: SUM-7281H010
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Chevy, Big Block, Set
Part Number: SUM-G6511
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Alternator Bracket, Steel, Black, Water Pump Mount, Long Water Pump, Chevy, Small Block, Set
Part Number: SUM-G4016B
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve, Intake, Stainless Steel, 1.940 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Each
Part Number: SUM-V8000-1
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC 2.000 pin, Doweled, Standard Clearance, set
Part Number: SUM-745HDS
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 4340 Rotating Assembly, 410 Cid., 4.040 bore, 4.000 stroke, 24X, 6.125 rod, 8cc dish, 11.2:1 @ 65cc, 10.6:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400408
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 4340 Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 24X, 6.125 rod, 12cc Dish, 9.7:1 @ 65cc, 9.3:1 @ 70cc, File-Fit rings, H Bearings
Part Number: SUM-R2436L03012
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Pro LS 4340 Rotating Assembly, 416 Cid., 4.070 bore, 4.000 stroke, 24X, 6.125 rod, 21cc dish, 9.9:1 @ 65cc, 9.5:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R244007021
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Alternator Pulley, V-Belt, 1-Groove, Aluminum, Polished, .642 in. Bore, Bolt-On, GM/Ford, Each
Part Number: SUM-G3968
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
SB Mopar 360 Forged Steel Crank, 4.000 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.
Part Number: SUM-MOP3604000
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
SB Mopar 360 Forged Steel Crank, 3.580 stroke, 6.123 in. Rod, May Req. Heavy Metal, Lightning Holes on Rod Journals, Narrowed Rod Bearings Req.
Part Number: SUM-MOP3603580
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Spacers, Harmonic Balancer Replacement Parts, Circlip, Sleeve, Kit
Part Number: SUM-35260
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Water Pump Pulley, Serpentine, Aluminum, Polished, Replacement for SUM-340400 Pulley Set Only, Each
Part Number: SUM-340400-3
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Valve Cover Grommet, Breather, Baffled, 1.25 in. Outside Diameter, 1 in. Inside Diameter, Each
Part Number: SUM-G3428
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Timing Pointer, Billet Aluminum, Black, Adjustable, 6.25 in. Balancer, Chevy, Big Block, Each
Part Number: SUM-164625
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 Extra Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HXS
Not Yet Reviewed
Estimated Ship Date: Monday 10/6/2025
Estimated Ship Date: Monday 10/6/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.